Laserfiche WebLink
<br />APPENDIX A <br />Cost Estimate <br />CSAH 14 Water Main <br /> <br />Item Description <br />12" HOPE water main - directional drill <br />6" PVC water main <br />12" gate valve <br />Valve rod extension <br />Hydrant w/valve <br />Connect to existing 8" PVC <br />Fittings <br />Clearing and grubbing <br />Traffic control <br />Cross under culverts <br />1" Copper service <br />1 " Copper service - directional drill <br />1 " curb stop and box <br />1 ' corporation stop <br /> <br />Unit Qty Unit Price <br />LF 2600 $45.00 <br />LF 50 $25.00 <br />EA 3 $1,000.00 <br />EA 6 $150.00 <br />EA 3 $2,000.00 <br />EA 1 $600.00 <br />LB 2000 $1.50 <br />LS 1 $500.00 <br />LS 1 $2,000.00 <br />LS 1 $2,000.00 <br />LF 100 $12.00 <br />LF 200 $20.00 <br />EA 11 $80.00 <br />EA 11 $80.00 <br />Subtotal <br />10% Contingencies <br />TOTAL Construction Cost <br />20% Eng., Inspec., Admin. <br />TOTAL PROJECT <br /> <br />Total Price <br />$117,000.00 <br />$1,250.00 <br />$3,000.00 <br />$900.00 <br />$6,000.00 <br />$600.00 <br />$3,000.00 <br />$500.00 <br />$2,000.00 <br />$2,000.00 <br />$1,200.00 <br />$4,000.00 <br />$880.00 <br />$880.00 <br />$143,200.00 <br />$14,300.00 <br />$157,500.00 <br />$31,500.00 <br />$189,000.00 <br />