My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-11-30 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2005
>
2005-11-30 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:37:51 PM
Creation date
11/23/2005 1:50:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />PO BOX 1446 <br />SIOUX FALLS, SO 57101 <br />PHONE (605) 334-9749 <br />FAX (605) 334.9752 <br />AFTER HOURS {60S) 334.0029 <br />www.maguireiron com <br /> <br />Maguire Tank, Inc. <br /> <br />WATER TOWER SPECIALISTS <br /> <br />July 27, 2005 <br /> <br />Mr. Tim Grinstead <br />Bonestroo Rosene Anderlik & Associates <br />2335 West Highway 36 <br />S1. Paul, MN 55113 <br /> <br />Re: Centerville, MN-Elevated Water Storage Tank <br /> <br />Dear Mr. Grinstead: <br /> <br />Please find enclosed our proposal for the additional work that was performed <br />during the watennain installation due to a buried gas line. The following items <br />are associated with this additional work Attached is the receipt for the trench box <br />rental and a breakdown of the hours per day per your request. <br /> <br />1) Trench Box Rental <br />2) (40) Additional Labor Hours <br />(5) Men (8) Hr. Day for (n Days <br />3) (2) Additional Loads of Rock <br />4) Tank & Tower Foundation 15% Overhead & Profit <br />5) Maguire Iron, Inc. 5% Overhead & Profit <br /> <br />$921.00 <br />$1202 00 <br /> <br />$760,00 <br />$432.00 <br />$165.00 <br /> <br />Total Amount <br /> <br />$3.480.00 <br /> <br />The total additional amount associated with this additional work tbat was <br />performed is $3.480.00. <br /> <br />Please review this proposal and advise us if it is acceptable. A change order will <br />need to be processed for this additional work that was perfonned. <br /> <br />Please feel free to contact me at your convenience at (605) 334-9749 with any <br />questions or if you require any additional information. <br /> <br />Sincerely, <br />Maguire Iron, Inc. <br /> <br />~~ <br /> <br /> <br />;1 <br /> <br />. 'Nater Tanks and Towers · Fabricating · Erecting · Repairing <br /> <br />. Painting · New and Used Tanks <br />
The URL can be used to link to this page
Your browser does not support the video tag.