My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-05-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2009 3:22:42 PM
Creation date
5/11/2009 3:21:21 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />tlIlItJt $:i~'7_1 _I >>'_0IlIIII r <br />1._1 __ <br /> <br />. 1 t with thepump___ the a, ITlil41 <br /> <br />D. Long Term Maintenance Plan <br />Routine maintenance of the BMPs will be handled primarily by the City (removal of sediment <br />plumes in the pond, storm sewer jetting as needed). Street cleaning completed by the City is <br />expected to remove the larger sediments prior to entering the BMPs. Annual maintenance is also <br />required per the City's SWPPP. Long term maintenance needs may include replacement of the <br />pump works and excavation of the pond to maintain its storage capacity. <br /> <br />E. Pollutant Reduction <br />This project will help to directly address the phosphorus and other pollutant loads that are a <br />concern for the lake by phased installation of two stormwaterfbiofiltration basins, storm sewer <br />system to route proposed impervious surfaces to the BMPs prior to discharge to the lake, <br />rainwater gardens, pervious pavement, citizen education program and a water re-use system. <br />The estimated load reduction is 46.7Ibfyr ofTP, 38.2 ac-ft/year of water volume and 14,488 <br />IbJyear of TSS for the project as a whole. <br />
The URL can be used to link to this page
Your browser does not support the video tag.