My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-24 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2002
>
2002-07-24 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2009 8:47:56 AM
Creation date
5/12/2009 8:44:18 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 1 of 1 <br /> <br />c~ <br /> <br />Kim Sykes <br /> <br />From: <br />To: <br />Cc: <br />Sent: <br />Subject: <br /> <br />"Peterson, Tom W" <tpeterson@bonestroo.com> <br />"Kim Moore Sykes (E-maiO' <ksykes@centervillemn.com> <br />"Paul Palzer (E-mail)"<ppalzer@centervillemn.com> <br />Wednesday, July 17, 2002 10:49 AM <br />Buechler Estates <br /> <br />1~-i Y <br />~O6' Y if <br /> <br />Kim, <br /> <br />Paul asked me to email you regarding an overweight permit for Carl Buechler. This is necessary to <br />allow trucks to haul material on Mound Trail (currently a 5-ton axle limit) . We have been discussing <br />the street reconstruction in front of his development for several years. Now that homes have been built <br />on all the lots (except one), it is a good time to reconstruct the street. <br /> <br />This should be a council agenda item for Wednesday, July 24, 2002. I recommend we grant the <br />contractor a permit to haul road materials and equipment on Mound Trail, from CSAH 14 to 0.5 miles <br />west, for the purpose of reconstructing approximately 600 feet of street. Mr. Buechler is currently <br />obtaining quotes from several contractors for this work. The cost would be shared 50-50 by Mr. <br />Buechler and the City of Centerville. <br /> <br />If the work is done in July or August, the subgrade should be dry and hard. The trucks should not <br />damage the existing street. This permit is a necessary first step in the process to complete the work this <br />summer. <br /> <br />I will be available at the Council meeting to discuss this further. <br /> <br />Tom Peterson <br />Bonestroo Rosene Anderlik & Associates <br />651-604-4868 <br />651-636-1311 (fax) <br />tpeterson@bonestroo.com <br /> <br />7/17/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.