Laserfiche WebLink
<br />I <br /> <br />3. The stockpiles must be kept within the designated limits and not be <br />allowed to spread to the extent that it interferes with City activities. <br /> <br />C. Prior to starting work, the CONTRACTOR shall meet the ENGINEER and <br />OWNER to discuss the method and means of material and means of material <br />supply, a work schedule, and a general review of the specifications. <br /> <br />D. The CONTRACTOR is responsible for notifying the ENGINEER and OWNER <br />72 hours in advance of the seal coating operations to allow time to distribute <br />notification to the residents restricting parking and use. <br /> <br />E. All bituminous crack repairs will be completed prior to seal coat operations. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 MATERIALS <br /> <br />A. Bituminous Material: <br /> <br />1. Conform to MnDOT Spec. 3151, Emulsified Asphalt, Cationic Grade, <br />CRS-2. <br /> <br />B. Seal Coat Aggregate: <br /> <br />1. Conform to MnlDOT Spec. 3127, and 3137: <br /> <br />a. FA-2, Class C aggregate. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 GENERAL <br /> <br />A. Prospective bidders are advised to inspect all streets and verify existing conditions <br />to their own satisfaction prior to submitting a bid. <br /> <br />616-01-121 <br />to 2002 Bonestroo, Rosene, <br />Anderlik & Associates, Inc. <br /> <br />02785.2 <br /> <br />BITUMINOUS PAVEMENT TREATMENTS <br />