My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-09-19 CC Worksession
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2002
>
2002-09-19 CC Worksession
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2009 8:28:38 AM
Creation date
5/13/2009 8:27:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Miscellaneous <br />Minor cuts were made in areas in which little or no history of expenditures <br />occurred. This is an attempt to reduce unnecessary line items. Changes were <br />made, as shown on the attached budget adjustment worksheet, in the areas of <br />Building Inspection, Public Works, Park Programs and Park Maintenance. <br /> <br />Capital Improvements <br />An additional $36,714 was added to Street Capital Outlay. This amount reflects <br />the balance remaining from cuts in other areas after the reduction of the property <br />tax levy to last year's level. <br /> <br />Fire Protection <br />No change in this area. The fire department has submitted its budget; however, <br />we have not yet received the allocation percentages. The city's portion is <br />estimated in the 2003 budget until final figures are received. <br /> <br />Capital Outlay <br />No change in this area, but more discussion is needed. All capital expenditures <br />are listed at the end of the 2003 Expenditure Detail Budget. The estimates for <br />infrastructure replacement are very preliminary. I would recommend that a street <br />and water study be completed by the city engineer in an effort to plan more <br />efficiently. A street plan and a water management plan would greatly aid in the <br />development of a new five-year capital improvement plan. The amount of <br />$15,000 for each study was included in the proposed 2003 budget in the Street <br />Account and Water Fund, respectively. The Public Works Director has provided <br />a list of infrastructure needs. If each council member could rate the proposed <br />improvements in order of importance, a composite priority list could be <br />established. <br /> <br />Enterprise <br />No change in this area, but more discussion is needed. The Water and Sewer <br />Funds include proposed budgets for capital projects, (i.e., replacement of water <br />tower, new well, pond work, etc.) These numbers will be adjusted as council <br />further prioritizes projects and determines the amount of fund balance to be <br />utilized. A fund balance analysis is being prepared for the benefit of the council <br />in making these decisions. <br /> <br />Respectfully Submitted: <br /> <br />Approved By: <br /> <br />Finance Director <br /> <br />Administrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.