Laserfiche WebLink
<br />'\ <br /> <br />a) Location before work 0,50 x 30 = 15.00 <br />b) Compliance during work LSO x 30 45,00 <br />c) Completion after work LSO x 30 45.00 <br />d) Re-inspection 0.75 x 40 = 30.00 <br />3) Testing Result Review <br />a) Compaction 0.083 x 40 3.33 <br />b) Material 0.083 x 40 = 3.33 <br />4) Mapping <br />a) Review data 0.50 x 45 = 22.25 <br />b) Transfer to city mapping 0.25 x 45 11.25 <br />(AutoCAD) <br />Total Cost $275.40 <br />The average trench is 330 lin, ft past the width of a hole. Therefore, <br />the number of 100 lin. ft. (or portion thereof) units is 4. The cost per <br />100 lin. ft. unit is 275.40/4 = $68.85/100' unit. <br /> <br />Proposed Fees <br /> <br />= $70.00/100 lin, ft. <br /> <br />(plus Hole Fee) <br /> <br />2. Obstruction Permit Fee <br />A) Administration 0.25 x 40 = $10.00 <br />B) Recording 0.25 x 40 $10.00 <br />C) Review 0.75 x 45 $33.75 <br />Minimum Base Coat $53.75 <br />