Laserfiche WebLink
<br />. Large bay doors <br />. Wide doorways and hallways for equipment and set movement <br />. Raised floors or communications raceways in floors or ceilings for cabling <br />. Acoustically acceptable interior space for studios and edit suites <br />. ADA accessibility <br />. Wide easy access from garage area to studio <br />. High quality communications infrastructure within building for computer <br />network, phones, video production equipment <br />. Electrical system capable of handling necessary power load <br />. Availability of generator and backup power within building <br />. Space and appropriate zoning for wireless communications, including satellite <br />downlinks as well as potential microwave antenna placement <br />. An HV AC system capable of handling heat dissipation/cooling required for video <br />production equipment. <br />. Appropriate fire suppression systems geared toward electrical fires <br />. General attractiveness of building to general public <br /> <br />The following quote is taken from the consultant's report: "It is important to note, that <br />based on: the amount of space that needs to be added; the amount of remodeling that <br />needs to be done; the condition of the current facility; and the space available at the <br />current site, we have determined thus far that it would likely be cost prohibitive to expand <br />the current facility as compared to building or purchasing a new, larger facility <br />altogether..... . Finally, we feel that in designing a new facility, staff and other users will <br />have the advantage of being able to create a facility that more exactly meets their needs <br />now and in the future." <br /> <br />Moving Forward <br /> <br />A decision regarding whether and where to build a new facility must be made relatively <br />quickly for several reasons: <br /> <br />. The cable company must bring the community channels to the new facility via the <br />institutional network. Upgrading the network is scheduled to be done, but thc <br />design of the system will be greatly affected by the location of the new facility. <br />. We will only have the 15-year franchise term available to pay off the loan, and the <br />franchise term will begin on November 22, 2002. <br />. Our current facility could, at any time, become unavailable to us for future use. <br /> <br />. Make a Decision <br />The Cable Commission, the Operations Committee (made up of the city managers of <br />the seven cities) and Media Center staff, believe that owning a facility by the end of <br />the 15 -year franchise term makes the most financial sense for the organization. While <br />franchise fees and PEG fees are guaranteed for the 15 year term of the current/new <br />franchise, it would be difficult, if not impossible, to predict what the funding scenario <br />will be in any new franchise term. Owning a facility outright, at the end of the <br /> <br />P.3 <br />