Laserfiche WebLink
<br />DRAFT <br />3/29/02 <br /> <br />areas will need to be implemented and commensurate additional square footage <br /> <br />added. In a few cases, we've recommended reducing the size of certain areas, <br /> <br />based on projected requirements. The list below summarizes all those areas and <br /> <br />the space adjustments needed for each. <br /> <br />Facility Expansion Summary <br /> <br />It is important to note that, based on: the amount of space that needs to be <br /> <br />added; the amount of remodeling that needs to be done; the condition of the <br /> <br />current facility; and the space available at the current site, we have determined <br /> <br />thus far that it would likely be cost prohibitive to expand the current facility as <br /> <br />compared to building or purchasing a new, larger facility altogether. Also, it is <br /> <br />quite a bit easier, and therefore less expensive, to add wiring for the routing <br /> <br />system during new construction than to retrofit it to the current facility. Finally, <br /> <br />we feel that in designing a new facility, staff and other users will have the <br /> <br />advantage of being abie to create a facility that more exactly meets their needs <br /> <br />now and in the future. . As the plans for necessary facility changes are made, we <br /> <br />recommend space be modified, added or expanded for the functional areas <br /> <br />described below: <br /> <br />Expand Studio Space: <br /> <br />The Public Studio is oddly shaped, making It difficult to use effectively. <br /> <br />The Staff Studio needs to be enlarged to handle multiple sets. <br /> <br />North Metro Media Center Narrative <br />CBG Communications, Inc. Of/?"I02 <br />P.8 <br /> <br />Page 35 of 47 <br />