My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-11-27 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2002
>
2002-11-27 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2009 9:36:40 AM
Creation date
5/13/2009 9:34:27 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Effective 9/5/00 <br />City of Centervi11e Ord. #4 <br /> <br />Commercial uses (as defined by Ordinance #4) in the M-1 District will follow the Commercial guidelines <br />for percentage of green space. For all other properties in the M-1 District, the maximum accessory <br />structure allowed is 704 square feet and 440 square feet in the R-4 District, neitherto exceed the size of <br />the principal structure if an attached garage does not exist. If an attached garage exists, the maximum <br />accessory structure allowed is two (2) percent of the lot size or a maximum of 200 square feet. <br /> <br />Division 70: Site Pian Review Required <br /> <br />For all land use applications or permit applications, a site plan review is required by the Zoning <br />Administrator or their designee. Said review shall take place thirty (30) days prior to the desired Planning <br />and Zoning meeting. For example, if a property owner desires to construct a home (or any other <br />structure) and desires to have it presented to the Planning and Zoning Commission in May, the <br />application and site plan need to be presented to the Zoning Administrator or his/her designee the first <br />week in April. <br /> <br />Section 070-010: Submittal Requirements. <br /> <br />A. Boundary survey of parcel including identification of all monuments; and <br /> <br />B. Scaled location of all buildings, structures, driveways, sidewalk, trails, parking stalls <br />and curbing; and <br /> <br />C. Scaled identification of all setback dimensions from property lines; and <br /> <br />D. Scaled locations of all existing and proposed utilities and easements; and <br /> <br />E. Scaled depictions of floor plans for each story; and <br /> <br />F. Scaled depictions of each building elevation and descriptions of exterior building <br />materials and color schemes; and <br /> <br />G. Scaled site grading plans, including erosion and sedimentation control mechanisms <br />and procedures; and <br /> <br />I. Scaled delineations of any shoreland, floodplain or wetland areas on the site; and <br /> <br />J. Identification of any floodplain or wetland encroachments and detailed mitigation <br />plans; and <br /> <br />K. Detailed landscape plans, illustrating size, types and locations of all materials, a <br />description of site seeding or sodding, a description of the timetable for site <br />landscaping and the identification of any irrigation systems; and <br /> <br />L. Detailed descriptions of any site fencing, including type, location and height. <br /> <br />All plans shall be dated and bear the preparer(s) name(s), including professional registrations or <br />certifications when appropriate or required. <br /> <br />Page 18 of 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.