Laserfiche WebLink
<br />DRAFT <br />3/29/02 <br /> <br />The square footage required to replace the existing facility would be <br /> <br />approximately 6,300 square feet. Added together with the 4,200 square <br /> <br />feet of space needed for facility expansion, this means that the total cost <br /> <br />of the new facility construction (10,500 square feet) would be <br /> <br />approximately $1,312,500, based on a cost of $125 per square foot and <br /> <br />not including land and operating costs. Again, it should be noted that <br /> <br />actual cost per square foot prices will vary depending on the labor and <br /> <br />material costs in the North Metro area at the time of construction. <br /> <br />Conclusion <br /> <br />In summary, the recommendations herein for equipment and facility upgrades, <br /> <br />additions, enhancements and modifications, combined with the replacement <br /> <br />schedule shown in the accompanying equipment matrix, should provide for a <br /> <br />highly satisfactory production facility environment to meet the community access <br /> <br />needs of the North Metro area now and well into the future. The following <br /> <br />summary shows what the total capitai costs would be. <br /> <br />Recommendation - Build or acquire a new facility and replace, update and <br /> <br />enhance equipment. <br /> <br />CBG Communications, Inc. <br /> <br />North Metro Media Center Narrative <br />Of""~/02 <br />P.19 <br /> <br />Page 46 of 47 <br />