Laserfiche WebLink
<br />Oct 16 2002 9:00AM <br /> <br />BONESTROO ROSENE ANDERlIK 6516361311 <br /> <br />Trunk Costs (oversizing) <br /> <br />Phase I <br /> <br />Pipe; <br />Valves: <br />Fittings: <br />Restraint: <br /> <br />Sanitary sewer from Centerville Road to Mallard Way was 12" PVC, <br />exclusively for grade reasons. Therefore not a trunk facility. <br /> <br />12" PVC watermain vs. 6' PVC. <br />Low bidder had S23ILF for each. <br />Zhd and 3rO bidder differed b)' $5 and $6.33 respectively. <br />Avernge is $5.66/LF <br /> <br />Calculation: <br /> <br />3223' x $5.66/LF = <br />5 ea x $735.00/ea = <br />6.000# x O,851Ib. = <br />48 oa x $15.00/ea ~ <br />Subtotal <br />Indirect Costs (28.61%) <br />Total Tnmk Cost <br /> <br />$18,242.18 <br />$3.675.00 <br />$5,100.00 <br />$720.00 <br />$27,737.18 <br />$7.935.61 <br />$35,672.79 <br /> <br />< <br /> <br />5 11 //7 3 <br />) /, 3LfCj <br /> <br />~ 1AW15r~ <br />ho...h:u1 CL 0UJ-t^1 <br /> <br />d.'-/, 3~'-I <br /> <br /> <br />~, <br /> <br />1'.2 <br /> <br />, <br />