<br />4.2.7 The Grantee shall maintain complete and comprehensive as-built drawings of the <br />subscriber network, I-Net and DFOI throughout the Franchise term, and shall <br />make them available to the Commission and/or the City for inspection, upon <br />request, on a confidential basis. As-built drawings shall be updated continually as <br />changes occur in the subscriber network, the I-Net and/or the DFOL The Grantee <br />shall provide to the City, upon request, (including electronic form) copies of all <br />as-built drawings showing the Grantee's facilities and equipment in the Rights-of- <br />Way, and on private property where necessary to investigate citizen complaints or <br />to determine Franchise compliance. The Grantee shall also maintain throughout <br />the Franchise term a full set of headend and hub routing diagrams, showing <br />routing from source input to combiner output and routing between head ends and <br />hubs, for all subscriber network, I-Net and DFOI signal transport. Such routing <br />diagrams shall be made available to the City and/or the Commission for <br />inspection, upon request, on a confidential basis. <br /> <br />4.3 Periodic Pro2ress Reportin2. <br /> <br />Following commencement of construction of the System Upgrade, the DFOI and the 1- <br />Net upgrade or any similar major construction, the Grantee shall, upon request of the <br />Commission, meet with the Commission and provide an update on the progress' of the <br />System Upgrade, the DFOI construction and the I-Net upgrade or other construction. <br /> <br />4.3.1 Public Notification. Prior to the beginning of the System Upgrade, and <br />periodically during each phase of construction, the Grantee shall inform the public <br />and its Subscribers, through various means, about: (i) the progress of the System <br />Upgrade or major construction; (ii) areas where construction crews will be <br />working; and (iii) any expected temporary interruptions to existing services which <br />may occur. <br /> <br />4.3.2 Delays in the Construction. The Grantee shall be excused from the timely <br />performance of its obligation to begin and complete any System Upgrade, DFOI <br />construction, and I-Net upgrade within the time specified herein, for the following <br />occurrences: <br /> <br />4.3.2.1 <br /> <br />Any "Force Majeure" situation, as described herein; and <br /> <br />4.3.2.2 <br /> <br />Unreasonable failure or delay by the City to issue any permits or <br />permission upon a timely and complete application submitted to <br />the City by the Grantee or its contractor representative and tender <br />of any required permit fee. <br /> <br />4.3.3 Consequences of Delays. Absent a showing of excusable delay pursuant to <br />subsection 4.3.2 above, should the Grantee be unable to demonstrate the <br />commencement or timely completion of the System Upgrade, the DFOI and the 1- <br />Net upgrade by the times specified herein, or be unable to reasonably justify any <br />delays, then the Grantee shall be in violation of a material provision of this <br /> <br />22 <br />