<br />7.2.2 Prior to the implementation of the DFOI described in S 7.2.1 above, the Grantee <br />has made available to the City and the Commission for review a detailed design <br />map of the proposed Dark Fiber Optic Infrastructure construction plan, including, <br />but not limited to, (i) the proposed fiber route, and (ii) the name and location of <br />facilities being served by the DFOI. The Grantee will take the comments of the <br />City and/or the Commission into account in implementing the DFOI plan. <br /> <br />7.2.3 The DFOI shall not be considered accepted until all applicable cabling and <br />construction standards have been met or exceeded. Specifically, the Grantee shall <br />notify the Commission, or its designee, in writing, at least ten (10) days in <br />advance of completion of construction of each DFOI site. The notice shall <br />include the date the Grantee is prepared to conduct an OTDR test at 1550 nm and <br />1310 nm end-to-end, according to industry standard and accepted test <br />methodologies. The Commission, or its designee, shall have the option of <br />attending any test conducted pursuant to this paragraph. All tests must be <br />successfully completed. The fiber optic tests shall be deemed successfully <br />completed if the optical performance standards in Exhibit B are met or bettered. <br />If any DFOI link does not pass the tests required herein, the Grantee shall take all <br />necessary steps to meet the applicable standards, and the affected link shall be <br />retested prior to acceptance. The Grantee shall send the Commission and the City <br />the results of each test conducted under this paragraph. Failure to timely <br />complete construction of the DFOI shall be a violation of this Franchise. <br /> <br />7.2.4 The Commission, or its designee, shall have the option of conducting a physical <br />inspection of the construction of the DFOL This inspection shall be conducted no <br />later than the date of a successfully completed test as described in Subsection <br />7.2.3. <br /> <br />7.2.5 After completing installation of each DFOI link, the Grantee shall provide <br />documentation to the City, or its designee, including but not limited to: splice <br />locations; panel numbers; strand numbering schemes; OTDR; other optical test <br />results; and any other pertinent documentation. <br /> <br />7.2.6 Dark Fiber Infrastructure Users and any Additional DFOI Users connected to the <br />DFOI shall be responsible for any end user or interface equipment needed for <br />transmission or reception of signals on the Dark Fiber Optic Infrastructure, except <br />as indicated in subsection 7.1.9. <br /> <br />7.3 Grantee's Use on-Net and DFOI Capacity. <br /> <br />The I-Net and the DFOI shall be for the exclusive use of the City, the Commission, I-Net <br />Users, Dark Fiber Infrastructure Users and Additional DFOI Users throughout the term of <br />the Franchise. Notwithstanding the foregoing, the Grantee may use capacity on the I-Net <br />and the DFOI, including for lease or other commercial purposes, provided that the City, <br />the Commission, I-Net Users, Dark Fiber Infrastructure Users and Additional DFOI <br /> <br />40 <br />