Laserfiche WebLink
<br /> Contract Unit Quantity Amount <br />No. Item Unit Quantity Price to Date to Date <br /> Part 1 . Site Work <br />1 Class V aggregate base TN 140 10.50 24.5 $257.25 <br />2 4" concrete driveway apron SF 40 10.00 75 $750.00 <br />3 Select topsoil borrow (LV) CY 20 20.00 20 $400.00 <br />4 Seed and mulch - Mixture 60A AC 0.5 2000.00 0.5 $1,000.00 <br />5 Erosion control (silt fence) LF 100 4.00 0 $0.00 <br /> Total Part 1 - Site Work $2,407.25 <br /> <br />Part 2 - Lift Station Equipment Replacement <br /> <br />6 <br /> <br />Remove existing pumps, piping and controls and <br />replace with specified pumps, piping and controls <br />Total Part 2 - Lift Station Equipment <br />Replacement <br /> <br />LS <br /> <br />38000.00 <br /> <br />$38,000.00 <br /> <br />$38,000,00 <br /> <br />Total Part 1 - Site Work <br />Total Part 2 - Lift Station Equipment <br />Replacement <br /> <br />$2.407.25 <br /> <br />$38,000.00 <br /> <br />Total Work Completed To Date <br /> <br />$40,407.25 <br /> <br />'< <br />< <br /> <br />RFP-stdForcilyl <br />