Laserfiche WebLink
<br /> Contract Unit Quantity Amount <br />No. Item Unit Quantity Price to Date to Date <br /> Base Bid: <br />1 12" HOPE. DR11 water main ~ directional drill LF 2622 39.00 2700 $105,300.00 <br />2 6" HOPE, directional drill LF 60 25.00 60 $1,500.00 <br />3 Directional drilling, extreme condition, any pipe <br /> size LF 200 5.00 $0.00 <br />4 8" PVC water main LF 30 30.00 28 $840.00 <br />5 6" PVC water main LF 10 28.00 20 $560.00 <br />6 12" gate valve and box EA 2 2300.00 2 $4,600,00 <br />7 8" gate valve and box EA 1 1750.00 2 $3,500.00 <br />8 6" gate valve and box EA 2 1500.00 2 $3.000.00 <br />9 Valve rod extension EA 8 150.00 9 $1,350.00 <br />10 Hydrant w/valve EA 3 3000,00 3 $9,000.00 <br />11 Connect to existing 8" PVC EA 1 1500.00 1 $1,500.00 <br />12 Fittings LB 2000 0.40 200 $80.00 <br />13 6" Pipe Restraint EA 15 5.00 14 $70.00 <br />14 8" pipe restraint EA 3 5.00 7 $35.00 <br />15 12" pipe restraint EA 19 15.00 3 $45.00 <br />16 Clearing and grubbing LS 1 1000.00 1 $1,000.00 <br />17 T rattic control LS 1 1000.00 1 $1,000.00 <br />18 Cross under SPWU culverts LS 1 500.00 1 $500.00 <br />19 1" Copper service LF 100 14.00 100 $1,400.00 <br />20 1" Copper service - directional drill LF 210 14.00 210 $2,940.00 <br />21 1" curb stop and box EA 9 450.00 9 $4,050.00 <br />22 1" corporation stop EA 9 450.00 9 $4,050.00 <br />23 Reconstruct manhole EA 1 10000.00 0.35 $3.500,00 <br />24 Sodding SY 500 4.00 1110 $4,440.00 <br />25 Seeding, MnDOT Mix 30B AC 0.6 2000.00 0.6 $1,ZOO.00 <br />26 Silt fence. regular LF 100 2.00 $0.00 <br />27 Street sweeper HR 5 100.00 5 $500.00 <br />28 Salvage and replace fence LF 40 20.00 $0.00 <br />29 Transplant tree or bush EA 5 200.00 $0.00 <br /> Total Base Bid: $155,960.00 <br /> <br />Total Base Bid: <br />Total Work Completed To Date <br /> <br />$155,960.00 <br />$155.960.00 <br /> <br />. <br /> <br />fi1B01123RE02.xl':; <br />