Laserfiche WebLink
<br />. <br /> <br />lm. <br /> <br />The pervious area that will be left undisturbed will 2.37 acres. The future construction of the <br />building pads has been included in the calculation. The remaining Pervious Area (5.50 <br />acres) will be disturbed. <br /> <br />It is understood that the proposed design meets The Watershed requirements for dead <br />storage, I-year and IOO-year storm events, and infiltration. If there are any further questions, <br />please contact me. <br /> <br />Sincerely, <br /> <br />Adam Parker <br /> <br />Attachments: <br /> <br />Attachment A: HydroCAD NURP Calculation <br />Attachment B: HydroCAD I-Year Calculation - Existing and Developed Condition <br />Attachment C: HydroCAD 100- Year Calculation - Existing and Developed Condition <br />Attachment D: Infiltration Worksheet <br />Attachment E: Drainage Maps - Existing And Proposed Drainage <br /> <br />J <br />