My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-27 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-05-27 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2009 3:42:03 PM
Creation date
5/21/2009 3:41:19 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C. How many citizens attended specifically for stormwater (excluding board/council members and <br /> staff/hired consultants)? <br />n. Was the public meeting a stand-alone meeting for stormwater or was it combined with some other ~ Stand-alone <br /> function such as a City Council meeting? Combined <br />E. Each MS4 must receive and consider input from the public prior to submittal of your annual report. Dyes DNo <br /> Did you receive written and/or oral input on your SWPPP? [part V.G.2.b.1-3]. <br />F. Have you revised your SWPPP in response to comments received from the public in calendar year Dyes DN( <br /> 2008 or early 2009 (if meeting held in 2009)? [Part V.G.2.c] If yes, describe. Attach a separate sheet <br /> if necessary: _ <br />Minimum Control Measure 3: Illicit Discharge Detection and Elimination [V.G.3] <br />The permit requires MS4s to develop, implement and enforce a program to detect and eliminate illicit discharges as <br />"efined in 40 CFR 122.26(b)(2) in your SWPPP. You must also select and implement a program of appropriate BMPs and <br />measurable goals for this minimum control measure. <br />A. Have you completed a storm sewer system map in accordance with the requirements of the permit? [gIYes DN( <br /> (MPCA assumes that completed maps will still need updates and corrections as changes occur). <br /> If yes, describe the form in which the map is available: <br /> D Hardcopy only [gI GIS system [gI CAD D Other system: _ <br /> If no, please explain: _ <br /> NOTE: The storm sewer system map was to be completed by June 30, 2008. [part V.G.3.a] <br />10. Has an ordinance or other regulatory mechanism been adopted to prohibit illicit discharges or other [gI Yes 0 Nt <br /> non-stormwater discharges from entering your system? Provide the date for the most relevant part <br /> of the regulatory mechanism that was adopted or estimated date of adoption: <br />k;. Have you completed the tasks associated with the schedule listed on BMP Summary Sheet 3c-1 in [gI Yes D Nt <br /> your program for illicit discharge detection and elimination? (attach additional information if <br /> needed) <br /> Indicate the status of development for tasks associated with BMP Summary Sheet 3c-1 : <br /> D Not started D Research D Development D Implementation D Program in place <br />~. Have you completed the tasks associated with the schedule listed on BMP Summary Sheet 3d-I for [gI Yes D Nt <br /> your Public and Employee Illicit Discharge Information Program? <br /> Indicate the status of development for tasks associated with BMP Summary Sheet 3d-I: <br /> D Not started D Research [gI Development D Implementation D Program in place <br />""inimum Control Measure 4: Construction Site Stormwater Runoff Control [V.G.4] <br />The permit requires that each MS4 develop, implement, and enforce a program to reduce pollutants in any <br />stormwater runoff to your small MS4 from construction activities within your jurisdiction that result in a land <br />disturbance of equal to or greater than one acre, including the disturbance of less than one acre of total land area that is <br />part of a larger common plan of development or sale if the larger common plan will ultimately disturb one or more acres <br />(include if your MS4 established a smaller site size). [Part V.GA.] <br />~. Have you adopted an ordinance or other regulatory mechanism that regulates stormwater runoff frorr [gI Yes D No <br /> construction activities that results in a land disturbance of greater than or equal to one acre and/or les! <br /> than one acre that is part of a common plan of development or sale that will ultimately disturb om <br />I acre or more? NOTE: Your regulatory mechanism must be fully developed and implemented withir <br />six months from the extension of permit coverage. <br /> <br />wq-stnn4-06 <br /> <br />Page 3 of7 <br />3 <br /> <br />12/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.