My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-06-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 3:58:06 PM
Creation date
6/5/2009 3:56:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />l <br /> <br />g. Street Light Installation. The Developer shall be responsible for the cost of street <br /> <br /> <br />light installation consistent with a street lighting plan approved by the City. <br /> <br />h. Ownership ofImprovements/Pond Maintenance. Upon completion of the work <br />and construction required by this Agreement, the Improvements lying within public easements <br />shall become City property without further notice or action; Developer shaH retain ownership <br />and maintain all ponds and other erosion control measures until adequate ground cover has been <br />established on the Plat including all lots in the Plat, at which time the ponds shall become City <br />property without further notice or action. However, the Developer shall maintain ponds until the <br />development is complete in conformance with this agreement, and provided that the engineer for <br />Developer shall certify that the ponds have been cleaned and provide the designed holding <br />capacity, prior to the city taking over responsibility for any ponds in the development. <br /> <br />I. City's financial participation in oversizing of utilities. The City shall participate <br /> <br /> <br />in the cost of the utilities needed for ovcrsizing the water. Developer shall include this work in <br /> <br /> <br />the construction contract for the Public Improvements. The City will reimburse the Developer <br /> <br />for these costs, based upon the actual unit prices contained in the City's most recent construction <br /> <br />project. The estimated reimbursement for this project is: <br /> <br />1050 feet of watermain @ $8.00/ft <br />2 gate valves @$650 <br /> <br />$ 8,400.00 <br />$ 1,300.00 <br /> <br />TOTAL <br /> <br />$ 9.700.00 <br /> <br />The City shall pay this reimbursement to Developer within thirty (30) days after <br /> <br /> <br />acceptance of the work by the City, and satisfactory proof that the work has been paid in full by <br /> <br /> <br />Developer. <br /> <br />Q:\Agreements\Pheasant Marsh 3\Pheasant Marsh 3rd Addition VIS.doc <br /> <br />Page 12 <br /> <br />1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.