My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-06-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 3:58:06 PM
Creation date
6/5/2009 3:56:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the Developer shall promptly reimburse the City for any expense incurred by the City, provided <br /> <br /> <br />the Developer, except in an emergency as determined by the City, is first given notice ofthe <br /> <br /> <br />work in default, not less than 48 hours in advance. This Agreement is a license for the City to <br /> <br /> <br />act, and it shall not be necessary for the City to seek a Court order for permission to enter the <br /> <br /> <br />Plat. When the City does any such work, the City may, in addition to its other remedies, assess <br />the cost in whole or in part. <br /> <br />22. MISCELLANEOUS. <br />A. Third parties shall have no recourse against the City under this Agreement. <br />B. Breach of the terms of this Agreement by the Developer shall be grounds <br />for denial of building permits, including lots sold to third parties. <br />C. If any portion, section, subsection, sentence, clause, paragraph, or phrase <br />of this Agreement is for any reason held invalid, such decision shall not affect the validity of the <br /> <br />remaining portion of this Agreement. <br /> <br /> <br />D. Building permits may be issued for five (5) single-family model homes on <br /> <br /> <br />lots in the plat, upon the City's receipt of the certified "as constructed" grading plan. Building <br /> <br /> <br />permits for non-model homes may be issued after installation of public utilities to the lot and <br /> <br /> <br />installation of class 5 aggregate base and concrete curb and gutter to the street. <br /> <br /> <br />E. If building permits are issued prior to the completion and acceptance of <br /> <br /> <br />Public Improvements, the Developer assumes all liability and costs resulting in delays in <br /> <br /> <br />completion of Public Improvements and damage to Public Improvements caused by the City, <br /> <br /> <br />Developer, its contractors, subcontractors, materialmen, employees, agents, or third parties. No <br /> <br /> <br />sewer and water connection permits may be issued and no one may occupy a model home or <br /> <br />building for which a building permit is issued on either a temporary or permanent basis until the <br /> <br />Q:\Agreements\Pheasant Marsh 3\Pheasant Marsh 3rd Addition VIS.doc <br /> <br />Page IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.