Laserfiche WebLink
<br />3. Driveways; <br />4. Drainage easements; <br />S. Utility easements; <br />6. Sewer service at the property line; and <br />7. Water service and shut-off at the property line. <br />(c) The certificate will also provide the following elevations: <br />1. Grading at the front lot line; <br />2. Grading at property comers; <br />3. Lowest floor elevation and structure type; and <br />4. One-hundred"'year flood elevation and 100-year t100El contour <br /> <br />property. <br /> <br />(B) Soil erosion. The developer shall control soil erosion as otherwise required by <br />the City Code. <br /> <br />(C) Monuments and markers. The developer shall place iron monuments in <br />accordance with state statutes. <br /> <br />(0) Curb stops. The developer shall arrange with the city to make all necessary <br />adjustments to the curb stops to bring them flush with the topsoil (after grading). <br /> <br />(E) Trees and landscaping shall be in accordance with the requirements for the <br />various zoning districts contained in the zoning chapter of the Code. <br /> <br />(G) Street maintenance. <br /> <br />(l) The developer shall be responsible for street and sidewalk maintenance, <br />including curbs, boulevards, sod, sidewalks and street sweeping, until the development is <br />accepted by the city. <br /> <br />(2) Warning signs as per the Minnesota Uniform Traffic Control Devices <br />Manual shall be placed when hazards develop in streets to prevent the public from <br />traveling on same and directing attention to detours. If and when the streets become <br />impassible, the streets shall be barricaded and closed <br /> <br />(3) The developer shall maintain a smooth driving surface and adequate <br />drainage on all temporary streets. No builders will be allowed on the dedicated street <br />areas until the streets are completed and accepted by the city. <br /> <br />(4) The developer may request, in writing, that the city keep the streets open <br />during the winter months by plowing snow from the streets prior to final acceptance of <br />the streets. The developer ~hall reimburse the city for all snow plowing prior to final <br /> <br />14 <br />