My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & Z - 12-06-05
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2005
>
P & Z - 12-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 1:57:13 PM
Creation date
12/2/2005 3:10:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />An application for review and approval of the final development plan shall be filed by the <br />applicant with the Planning and Zomng Commission within 6 months of the date on which approval of <br />the preliminary plan was given by the Council. If application for final approval is not made within the <br />time required, the proposal shall be considered abandoned unless an extension period is requested and <br />granted by the City Council. <br /> <br />1154.255 l)OCUMENTATION REQuntED. <br />The final application shall be accompanied by the following supporting documentation: <br />) <br /> <br />(A) A final plan of the PUD in schematic form including the following: <br /> <br />(1) The street system, lot layout and off-street parking and loading plan; <br /> <br />(2) The use, height, bulk and approximate location of buildings and other structures; <br /> <br />(3) Land areas to be conveyed, dedi.cated or reserved for parks, parkways, playgrounds, <br />school sites, pubtic buildings and similar public ap.d semi-public uses; <br /> <br />(4) A site plan for each building site and common open area, showing approximate location <br />of buildings, structures and improvements; <br /> <br />(5) GeneraIized elevations and perspectives of all structures; <br /> <br />(6) A site grading plan indicating the direction of flow of surface drainage and all easements <br />necessary for both ponding and runoff, <br />(7) Plans, profiles and specifications for the distribution of water, collection of sanitary waste <br />and stormwater; <br /> <br />(8) A landscape plan indicating the location, size and type of plant materials to be used; <br /> <br />(9) Plans, profiles, typical sections and specifications for proposed street improvements; and <br /> <br />(10) The density ofIand use to be allocated to the several parts of the site being developed. <br /> <br />(B) A written statement including: <br /> <br />(1) The approximate date when construction will begin by stage of development and the area <br />of open space to be provided at each stage; <br /> <br />(2) Agreements, provisions or covenants which govern the use, maintenance and continued <br />protection of the development and any of its common open areas; and . <br /> <br />(3) Other conditions specifically required by the Commission and the Council for the <br />particular PUD. <br /> <br />1154.256 ACTION ON FINAL APPLICATION. <br /> <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.