Laserfiche WebLink
<br />1154.258 AMENDMENTS-CHANGES TO THE PUD PLAN. <br /> <br />Amendments may be made in the approved final plan when they are shown to be required by <br />changes in conditions that have occurred since the final plan was approved or by changes in the <br />development eolicy of the city. <br /> <br />(A) Minor changes in the location, siting, and height of buildings and structures may be authorized <br />by the City Engineer if requested by engineering or other unforeseen circumstances. <br /> <br />(B) All other changes in use, rearrangement oflots, blocks and open space, must be authorized by <br />the City Council under procedures outlined for amendment oftbis chapter. <br /> <br />1154.259 COMPLETION. <br /> <br />(A) Completion of the PUD shaII be certified by the Planning and Zoning Commission on the final <br />development plan., Thereafter, the use ofland and the construction, modification or,a1teration of any <br />buildings shall be governed by the approved final development plan. <br /> <br />(B) Changes may be authorized only under the procedures provided below: <br /> <br />(1) Minor extensions, alterations or modifications of existing structures may be authorized by <br />the Planning and Zoning Commission if they are consistent with the intent and purpose of the final plan <br />and do not increase the cube of any building or structure by more than 10%; and <br /> <br />(2) Changes in the use of common open space or the replacement of any building <br />substantially destroyed which exceeds the intent and purposes of the final development plan may be <br />authorized only by amendment to the final development. <br /> <br />1154.260 SITE IMPROVEMENTS. <br /> <br />At any time following the execution of a PUD agreement and receiving a notice to proceed from <br />the City Administrator, the applicant may, pursuant to the applicable codes 'of the city, apply for and <br />the Zoning Administrator may issue grading permits for the area within the PUD for which <br />development stage plan approval has been given. <br /> <br />1154.261 CONSTRUCTION. <br /> <br />The construction and provisions of all the common open spaces and public and recreational <br />facilities which are shown on the final development plan must proceed at the same phase as the <br />construction of dwelling units. At least once every 6 months following the approval of the final <br />development plan, the Zoning Administrator shall review all of the building permits issued for the <br />planned development and examine the construction which has taken place on the site. Ifhe or she shall <br />find that the rate of construction of dwelling units is greater than the rate at which common open spaces <br />and public and recreational facilities have been constructed and provided, he or she shall forward this <br />information to the City Council, which may revoke the PUD Permit. <br /> <br />58 <br />