Laserfiche WebLink
<br />--------_._~_._------; <br /> <br />SAM'S CLUB I samsclub.com <br /> <br />Page 2 of3 <br /> <br />Features <br /> <br />. 14.9 cu. ft. <br />. Coil Free Back <br />. Never-Clean™ Condenser System <br />. Upfront temperature controls <br />. Color matched handle <br />. Reversible door <br />. Two adjustable wire shelves <br />. One full-width vegetable pan (opaque) <br />. Full-width freezer shelf <br />. Removable zip gaskets <br />. Optional icemaker (sold separately) <br />. Rollers <br />. One ice tray <br />. White only <br />. Dimensions: 28"W x 61 3/4"H X 31.'0 <br /> <br />~ 8~Mn JQJ9P. <br /> <br />Product Specifications <br /> <br />Most deliveries can be made within 3-5 business days (availability and frequencies are <br />determined by zip code) <br />. You will be contacted one day prior to your delivery with a 4-hour delivery window <br /> <br />Installation Includes: <br /> <br />. Disconnecting existing refrigerator <br />. Installing the new refrigerator in the same location <br />. Verifying that the new unit is fully functional <br /> <br />During Delivery: <br /> <br />. Be sure to have the necessary installation accessories (i.e. water lines, power cords, <br />vents) available for the delivery person. Federal, State, and Local codes prevent the <br />reuse of eXisting installation accessories. <br />. Inspect your new appliance for damage. The delivery person will explain your options <br />if damage is discovered. <br />. Verify that your new appliance has been tested and is operational before signing <br />the Proof of Delivery. <br /> <br />Professional installation of Your new refrigerator Is included with delivery <br />provided certain conditions exist Installation service includQs disconnecting the <br />existlna refriqerator. Instailina the new refrigerator and verifying that the new unit <br />Is fully functional. Unless ALL conditions listed here exist the Installer will be <br />unable to perfonn the Installation. <br /> <br />. Please have your home ready for your new appliance. <br />. There must be a dedicated 110/120-volt, three prong, grounded eleelrical ouUet <br />within 3' of the refrigerator. The electrical outlet must be protected by a 15 or 20 amp <br />circuit breaker or time delay fUse. <br />. Please have outlet installed prior to delivery if It does not already exist. The Delivery <br />Agent will NOT be able to install these outlets. <br />. All food and ice must be removed from your current refrigerator prior to delivery. <br /> <br />If you purchase an icemaker and icemaker installation the following applies: <br /> <br />. Refrigerators with icemakers must have a 1f4" water shutoff valve located on the wall <br />behind the unit. If there is not a waterline shutoff valve installed, the delivery agent will <br />not be able to complete the wateMine installation. <br />. New GE Smart-Connect tubing or copper tubing must be purchased prior to Ieernaker <br />hook-up. (Used accessories cannot be re-used for safety reasons.) The installer is <br />required to complete the connection of the water supply to the refrigerator using <br />approved tubing. <br /> <br />These key conditions MUST exist to assure proper installation of the refrigerator. <br /> <br />PLEASE INSPECT YOUR DELIVERY BEFORE SIGNING YOUR RECEIPTI <br />http://www.samsclub.comleclub/main _ shopping.jsp?n=O&oidPath=O%3a-23542%3a- 23586%3a-23600%3... <br /> <br />I <br />7/812004~ <br />