Laserfiche WebLink
<br />M'i <br />fiJeUiO..,. <br /> <br />".~ .-,} . <br /> <br />TO: Honorable Mayor and Council Members <br /> <br />FROM: Teresa Bender, City Clerk <br />SUBffiCT: 73m Street Survey Results <br /> <br />DATE: July 9, 2004 <br /> <br />RESULTS OF 73rd STREET (BRIAN DRIVE TO 20TH AVENUE) <br />STREET SURVEY <br /> <br />I Do nothing to the roadway at this time. Reconstruct the street in one (1) <br />or two (2) years with sand, gravel, drain tile and bituminous. Each <br />resident, adjacent and benefited, would be assessed approximately <br />$3,500 per parcel. With those comer lots (two - 2) on Brian Drive <br />being assessed approximately 1,750 per parcel. <br /> <br />X Go ahead with the current mill and overlay, which would patch the bad <br />areas, trench along the existing curbs, and install sand and drain tile. Add <br />a new lift of bituminous. This repair would only last approximately five <br />(5) years. Each resident, adjacent and benefited, would be assessed <br />approximately $276 per parcel with an additional assessment in the five <br />(5) years for total reconstruction. <br /> <br />IT 100% of the residents that own adjacentlbenefiting property (from Brian <br />Drive to 20th Avenue - total of 17 homes with the comer lots at Brian <br />Drive they would incur assessments approximately $1,350) petition the <br />City for a total reconstruction of the roadway with existing curb and gutter <br />left intact, the work will be completed this year. Each resident, adjacent <br />and benefited, would be assessed approximately $2,700 per parcel. With <br />those comer lots (two - 2) on Brian Drive being assessed approximately <br />$1,350 per parcel. <br />