Laserfiche WebLink
<br />---- <br /> <br />73rd STREET (BRIAN DRIVE TO 20TH AVENUE) STREET SURVEY <br /> <br />(please check the desired option below) <br /> <br />x <br /> <br />Do nothing to the roadway at this time. Reconstruct the street in <br />one (1) or two (2) years with sand, gravel, drain tile and <br />bituminous. Each resident, adjacent and benefited, would be <br />assessed approximately $3,500 per parcel. With those corner lots <br />(two - 2) on Brian Drive being assessed approximately 1,750 per <br />parcel. <br /> <br />Go ahead with the current mill and overlay, which would patch the <br />bad areas, trench along the existing curbs, and install sand and <br />drain tile. Add a new lift of bituminous. This repair would only <br />last approximately five (5) years. Each resident, adjacent and <br />benefited, would be assessed approximately $276 per parcel with <br />an additional assessment in the five (5) years for total <br />reconstruction. <br /> <br />100% of the residents that own adjacent/benefiting property (from <br />Brian Drive to 20lh Avenue - total of 17 homes with the corner lots <br />at Brian Drive they would incur assessments approximately <br />$1,350) petition t\1e City for a total reconstruction of the roadway <br />with existing curb and gutter left intact, the work will be completed <br />this year. Each resident, adjacent and benefited, would be assessed <br />approximately $2,700 per parcel. With those comer lots (two - 2) <br />on Brian Drive being assessed approximately $1,350 per parcel. <br /> <br />~~~ <br /> <br />Property Owner 19nature <br /> <br />t-/7-tJ( <br /> <br />Date <br /> <br />/CJP! -13,ul <br /> <br />