Laserfiche WebLink
<br /> Un" Quantity Quantity <br />No. Item Un" Quantity Price This Period To Date Amount <br />.' BASE BID B - PEDESTAL SPHERDID <br /> CONSTRUCTION: <br />'6 500,000 GALLON STEEL FLUTED COLUMN <br /> WATER TOWER. TOTAL BASE BID A LS $637,195.00 <br /> Breakdown of Base Bid B <br />6a Design Drawings LS $25,000 100.00% $25,000.00 <br />5b Foundation LS $210,000 37.62% 40.00% $84,000.00 <br />60 Steel Fabricated to Site LS $235,895 $0.00 <br />6d Field Erection LS $138,000 $0.00 <br />6e Reid Painting LS $190,000 $0.00 <br />6t Field Eleollioal LS $30,000 $0.00 <br />69 CalhoolC Protection LS $8,300 $0.00 <br /> Total Breakdown $109,000.00 <br /> FOUNDATION PILING - BASE BID B. PEDESTAL <br /> SPHEROID PILING: <br />18 9-518' DIA. CAST-IN-PLACE CONCRETE TEST PILE EA 2 $1,600.00 2 $3,200.00 <br />17 9-518' DIA. CAST-iN-PLACE CONCRETE PILING, <br /> DRIVEN LF 2080 $17.00 2061 $35,037.00 <br /> TOTAL FOUNDATION PILING $38,237.00 <br /> SITE WORK: <br />20 SALVAGE AND REINSTALL CHAIN LINK FENCE LF 24 $29.15 $0.00 <br />21 SALVAGE, STOCKPILE, AND RESPREAD TOPSOIL LS 1 $100.00 $0.00 <br />22 REMOVE WATER MAIN LF 114 $10.00 $0.00 <br />23 REMOVE STREET SWEEPING MATERIAL CY 220 $5.00 $0.00 <br />24 SILT FENCE, REGULAR LF 600 $3.00 $0.00 <br />25 6' HIGH CHAIN LINK FENCE LF 135 $18.45 $0.00 <br />25 20' WIDE DOUBLE SWING GATE EA 1 $1,030.00 $0.00 <br />27 TYPE 41 BITUMINOUS FOR DRIVEWAYS TN 40 $40.00 $0.00 <br />28 TYPE 31 BITUMINOUS BASE COURSE TN 50 $40.00 $0.00 <br />29 AGGREGATE BASE, CLASS 5,100% CRUSHED TN 700 $20.00 $0.00 <br />30 GEOTEXTILE FABRIC, TYPE V SY 360 $2.00 $0.00 <br />31 CONNECT TO EXISTING WATER MAIN EA 2 $500.00 $0.00 <br />32 16' PVC WATER MAIN LF 270 $45.00 $0.00 <br />33 16' DIP WATERMAIN, CLASS 52,INCL POLY LF 115 $40.00 $0.00 <br />34 6' DIP WATER MAIN, CL 52,INCL POLY WRAP LF 10 $25.00 $0.00 <br />35 6' GATE VALVE AND BOX EA 1 $650.00 $0.00 <br />36 12' GATE VALVE AND BOX EA 1 $1,500.00 $0.00 <br />37 16' GATE VALVE AND BOX EA 1 $4,000.00 $0.00 <br />38 CAST IRON FITTINGS LB 2065 $2.00 $0.00 <br />39 INSTALL HYDRANT EA 1 $1,800.00 $0.00 <br />40 OVERFLOW MANHOLE EA 1 $2,500.00 $0.00 <br />41 15' RCP STORM SEWER LF 120 $30.00 $0.00 <br />42 15' RCP FLARED END SECTION EA 1 $500.00 $0.00 <br />43 CLASS III RIPRAP, PLACED AT FLARED END <br /> SECTION CY 5 $100.00 $0.00 <br />44 MNDOT SEED MIX 70A AC 0.2 $5,000.00 $0.00 <br />45 WOOD FIBER BLANKET SY 500 $5.00 $0.00 <br /> TOTAL SITE WORK $0.00 <br /> TOTAL BASE BID B $109,000.00 <br /> TOTAL FOUNDATION PILINGS $38,237.00 <br /> TOTAL SITE WORK $0.00 <br /> TOTAL WORK COMPLETED TO DATE $147,237.00 <br /> MATERIALS ON HAND: <br /> PIPE, VALVES AND FITTINGS $22,851.03 <br /> TOTAL STORED MATERIALS $22,851.03 <br /> <br />61603130 Aeq 2.xIs <br />