My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-13 WW & CC Meeting
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2004
>
2004-10-13 WW & CC Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2009 9:26:00 AM
Creation date
6/19/2009 9:23:35 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />for development approval and attached and listed as Exhibit A. <br /> <br />1. Cost of Private Improvements, description: <br /> a. Landscaping as proposed in the site plan $10,000 <br /> (Attached as Exhibit A) 10 x $1,000 <br /> b. Sod in the common areas 10 x $1,500 $15,000 <br /> c. Striping of Parking Spaces $4,000 <br /> d. Retaining Wall 12 x $35 $4,000 <br /> e. Lighting 4@$I,OOO $4,000 <br /> f. RecyclingITrash Enclosure $1,500 <br /> g. Utilities (Phase (I &-II) $91,000 <br /> h. Storm Water Fee/Connection $3,484 <br /> (5.174 Acres @ .01546 per sq. ft.) <br /> Total Estimated Cost $132,984 <br /> Developer Retainage (150%) $199,476 <br /> <br />Additional Private Improvements as outline in attachment Exhibit C. (Bonestroo, Rosene, <br />Anderlik & Associates letter date October 14, 2003. <br /> <br />The above referenced Private Improvements shall be completed by October 1,2004. <br /> <br />2. Also included as items associated with the Private Improvements, the <br />Developer shall undertake or arrange to accomplish the following: <br /> <br />a. Site Develovment Issues <br /> <br />1. Coordinate with the utility companies to provide for <br />gas main, telephone lines, cable lines, and power <br />lines to service the properties developed on the final <br />plat according to the City's joint trench policy. <br /> <br />ii. Provide seeding and vegetation maintenance and <br />erosion control over denuded or graded areas and <br />mitigation area, at the City's direction. <br /> <br />iii. Establish a center monument (within the center <br />driveway(s) entering the commercial site) within 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.