Laserfiche WebLink
<br />. <br /> <br /> <br />TO: <br /> <br />Honorable Mayor & City Council Members <br />Kim Stephan ~ <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Parks & Recreation Committee's Recommendation to Council <br />Request for Dresel Contracting to Sub-Cut & Install Base for Trail Extension at <br />Laurie LaMotte Memorial Park. <br /> <br />DATE: <br /> <br />October 7, 2004 <br /> <br />Chairperson Peterson, as Public Works Staff, has discussed at the weekly construction meetings the <br />possibility of having Dresel Contracting sub-cut and install base for a 200' trail extension along the <br />east side of the parking lot at Laurie LaMotte Memorial Park and would like City Council to direct the <br />contractor to complete this work. Public Works Staff & the Parks & Recreation Committee feel that <br />this is a safety issue as the trail currently connects directly into the parking lot. The trail extension will <br />connect at a future time to the existing trail running east and west along the warming house. Although <br />the trail would be installed at a later time, the equipment used to sub-cut & install the base is already at <br />this location so this would be an advantageous time to do the work. <br /> <br />Motion was made by Chairperson Peterson, seconded by Committee Member Lindsay to <br />recommend to City Council requesting Dresel Contracting sUHut and install base for a trail <br />along the east side of the parking lot at Laurie LaMotte Memorial Park for connecting at a <br />future time to the existing trail running east and west along the warming house. All in favor. <br />Motion passed unanimously. <br />