My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-27 CC WS & Meeting
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2004
>
2004-10-27 CC WS & Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2009 9:44:32 AM
Creation date
6/19/2009 9:43:21 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />( <br /> <br />days of grading completion or within 180 days after <br />filing the :final plat, whichever is sooner, winter <br />. . weather conditions excepted. TIlls monument Will <br />be maintained by the association of the developer's <br />choice/TownOffice Park Association and not the <br />City of Centei-ville. <br /> <br />iv. <br /> <br />Provide such street maintenance and control of <br />builder's actions to maintain roadways clear. of <br />mud, soil, and debris to provide safe driving <br />surfaces. The Developer shan provide street <br />sweeping within 24 hours of the City's request for <br />such services. <br /> <br />The Developer shall accomplish or cause to be accomplished these actions <br />according to generally accepted trade standards. To the extent possible, the <br />construction vehicles for site grading, streets, and utilities shall access the site <br />from 20th Avenue. . <br /> <br />.b. Site Grading, Street Construction and Building Permits. No certificate of <br />occupancy shall be issued without insta11ation of bituminous parking lot, <br />except buildings started in January and February of 2004. Deyeleper sftall <br />deposit '/lith the City an eserew or letter ef eredit in the amouat of $76,000 <br />as seeurity for installatian of the bituminolls parking lot. <br /> <br />c. Erosion Control. The Developer shall control erosion ensuring: <br /> <br />1. The Developer shall submit an erosion control plan, <br />detailing all erosion control measures to be implemented <br />during construction. <br /> <br />ii. Erosion and siltation control measures shall be coordinated <br />with the different stages of development. Appropriate <br />control measures as required by the City shall be installed <br />prior to development when necessary to control erosion. <br /> <br />ill. Where the topsoil is removed, sufficient arable soils shall <br />be set aside for respreading over the developed area. The <br />topsoil shall be restored to a depth of at least four (4) inches <br />and shall be of a quality at least equal to the soil quality <br />prior to development. <br /> <br />d. <br /> <br />Inspection. All of the work shall be under and subject to the inspection and <br />approval of the City, City Engineer, and where appropriate, any other <br />govermnental agency having jurisdiction. <br /> <br />( <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.