<br /> -------------- - --- - -- - - - -- - -
<br /> Unit Quantity Quantity
<br />No. Item Unit Quantity Price This Period To Date Amount
<br /> BASE BID B - PEDESTAL SPHEROID
<br /> CONSTRUCTION:
<br />6 600,000 GALLON STEEL FLUTED COLUMN
<br /> WATER TOWER- TOTAL BASE BID A LS 1 $B37,195.00
<br /> Breakdown of Base Bid a
<br />6a Design Drawings LS 1 $25,000 100.0% $26,000.00
<br />6b Foundation LS 1 $210,000 60.0% 100,0% $210,000.00
<br />60 Steel Fabricated to Site LS 1 $235,895 80.0% 80.0% $1M,716.00
<br />6d Field Erection LS 1 $138,000 20.0% 20.0% $27,600.00
<br />6e Field Painting LS 1 $190,000 $0.00
<br />61 Field Electrical LS 1 $30,000 $0.00
<br />69 CathodIC Proteclion LS 1 $8,300 $0.00
<br /> T ota! Breakdown $451,316.00
<br /> FOUNDATION PIUNG - BASE BID B - PEDESTAL
<br /> SPHEROID PIUNG:
<br />16 9-5/8' DIA. CAST-IN-PLACE CONCRETE TEST PILE EA 2 $1,600.00 2 $3,200.00
<br />17 9-5/8' DIA, CAST-iN-PLACE CONCRETE PILING,
<br /> DRIVEN LF 20BO $17.00 2061 $35,037.00
<br /> TOTAL FOUNDATION PIUNG $38,237.00
<br /> SITE WORK:
<br />20 SALVAGE AND REINSTALL CHAIN LINK FENCE LF 24 $29.15 $0,00
<br />21 SALVAGE, STOCKPiLE, AND RESPREAD TOPSOIL LS 1 $100.00 $0,00
<br />22 REMOVE WATER MAIN LF 114 $10.00 $0,00
<br />23 REMOVE STREET SWEEPING MATERIAL CY 220 $6.00 $0.00
<br />24 SILT FENCE, REGULAR LF 600 $3.00 $0.00
<br />25 5' HIGH CHAIN UNK FENCE LF 135 $1B.45 $0.00
<br />25 20' WIDE DOUBLE SWING GATE EA 1 $1,030.00 $0.00
<br />27 TYPE 41 BITUMINOUS FOR DRIVEWAYS TN 40 $40.00 $0,00
<br />28 TYPE 31 BITUMINOUS BASE COURSE TN 50 $40.00 $0.00
<br />29 AGGREGATE BASE, CLASS 5, 100% CRUSHED TN 700 $20.00 $0.00
<br />30 GEOTEXTILE FABRIC, TYPE V SY 360 $2,00 $0.00
<br />31 CONNECT TO EXISTING WATER MAIN EA 2 $500.00 $0.00
<br />. 32 16" PVC WATER MAIN LF 270 $45.00 $0.00
<br />33 16' DIP WATERMAIN, CLASS 52, INCL POLY LF 115 $40.00 $0.00
<br />34 6' DIP WATER MAIN, CL 52, INCL POLY WRAP LF 10 $25,00 $0.00
<br />35 6' GATE VALVE AND BOX EA 1 $550.00 $0.00
<br />36 12'GATEVALVEANDBOX EA 1 $1,500.00 $0.00
<br />3716'GATEVALVEANDBOX EA 1 $4,000.00 $0.00
<br />38 CAST IRON FITTINGS LB 2065 $2.00 $0.00
<br />39 INSTALL HYDRANT EA , $1,BOO.OO $0.00
<br />40 OVERFLOW MANHOLE EA 1 $2,500,00 $0.00
<br />41 15' RCP STORM SEWER LF 120 $30.00 $0.00
<br />42 15' RCP FLARED END SECTION EA 1 $500.00 $0.00
<br />43 CLASS /II RIPRAP, PLACED AT FLARED END
<br /> SECTION CY 5 $100.00 $0.00
<br />44 MNDOT SEED MIX 70A AC 0.2 $5,000.00 $0.00
<br />45 WOOD FIBER BLANKET SY 500 $5.00 $0.00
<br /> TOTAL SITE WORK $0.00
<br /> TOTAL BI\SE BID B $451,316.00
<br /> TOTAL FOUNDATION PILINGS $38,237,00
<br /> TOTAL SITE WORK $0.00
<br /> TOTAL WORK COMPLETED TO DATE $489,553.00
<br /> MATERIALS ON HAND:
<br /> PIPE, VALVES ANO FITTINGS $22,851.03
<br /> TOT AL STORED MATERIALS $22,851.03
<br />
<br />61603130Aeq3Jds
<br />
|