Laserfiche WebLink
<br />days of grading completion or within 180 days after <br />filing the final plat, whichever is sooner, winter <br />weather conditions excepted. TIlls monument Will <br />be maintained by the association of the developer's <br />choicerrown Office Park Association and not the <br />City of Centerville. <br /> <br />IV. Provide such street maintenance and control of <br />builder's actions to maintain roadways clear of <br />mud, soil, and debris to provide safe driving <br />surfaces. The Developer shall provide street <br />sweeping Within 24 hours of the City's request for <br />such services. <br /> <br />The Developer shall accomplish or cause to be accomplished these actions <br />according to generally accepted trade standards. To the extent possible, the <br />construction vehicles for site grading, streets, and utilities shall access the site <br />from 20th Avenue. <br /> <br />b. Site Gradin2. Street Construction and Buildin2 Permits. No certificate of <br />occupanc! s~all be iss~d Witho~t installation of bituminous rfarking . lot, (. , ." <br />except buildings started In Ncv ,." bee of20.Qf. r u;f e '-<XoW M~ >f" <br />~fYl c;z...c'], \):. <br />c. Erosion Control. The Developer shall control erosion ensuring: i.- kJtUJc. (.,;-'. <br />P"""' <br />i. The Developer shall submit an erosion control plan, <br />detailing all erosion control measures to be implemented <br />during construction. <br /> <br />ii. Erosion and siltation control measures shall be coordinated <br />With the different stages of development. Appropriate <br />control measures as required by the City shall be installed <br />prior to development when necessary to control erosion. <br /> <br />iii. Where thc topsoil is removed, sufficient arable soils shall <br />be set aside for respreading over the developed area. The <br />topsoil shall be restored to a depth of at least four (4) inches <br />and shall be of a quality at least equal to the soil quality <br />prior to development. <br /> <br />d. Inspection. All of the work shall be under and subject to the inspection and <br />approval of the City, City Engineer, and where appropriate, any other <br />governmental agency having jurisdiction. <br /> <br />e. Faithful Performance of Construction Contracts and Letter of Credit. The <br />Developer Will fully and faithfully comply With all terms and conditions of <br />