Laserfiche WebLink
<br />Retrofit modifications to existing lighting fixtures........................................................... $.30/fixture <br /> <br />Electrical work commenced without filing the required permiL.................................. $70.00 <br />or double the calculated <br />fee, whichever is greater <br /> <br />Re-Inspection fee (when inspection is necessary to determine whether the unsafe conditions have <br />been corrected a fee may be assessed in writing by the inspector of............................. $25.00 <br /> <br />When inspections scheduled by the installer are pre-empted, obstructed, prevented or otherwise not <br />able to be completed as scheduled due to circumstances beyond the control of the inspector, a <br />supplemental inspection fee may be assessed in writing by the inspector of................. $25.00 <br /> <br />Transient Projects - Power supply fees as identified above, plus 2 hours ..................... $34.00/hour <br />Each attraction or concession inspection.......................................................... $25.00 <br /> <br />For purposes of interpretation of this section and Minnesota Rules, Chapter 3800, the most recently <br />adopted edition of the National Electrical Code shall be prima facie evidence of the definitions, <br />interpretations, and scope of words and terms used. <br />