My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-02-11 CC Meeting
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2004
>
2004-02-11 CC Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2009 10:42:01 AM
Creation date
6/19/2009 10:41:23 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br /> <br />- <br /> <br />'Estallishedl&i,7 <br /> <br />Other Pertinent Information: <br /> <br />1. Total Estimated Project Cost: $2,500,000 <br /> <br />2. Total Estimated Assessments: $1,000,000 (40% of project) <br /> <br />3. Number of properties being assessed: 143 <br /> <br />4. Typical range of assessment: $5,000 - $10,000 <br /> <br />5. Estimated annual payment over 15 years @ 7% interest: $550 - $1,100 <br /> <br />6. Total length of streets being reconstructed: 7,400' = 1.4 miles <br />Estimated cost of street improvements: $1,560,000 <br />Typical street/curb assessment: $4,000 per lot <br /> <br />7. Total length of new water mains: 7,300 <br />Estimated cost of water main improvements: $425,000 <br />Typical watermain assessment: $3,500 per lot <br /> <br />8. Total length of new storm sewer: 4,500' <br />Estimated cost of storm sewer improvements: $230,000 <br />Typical storm sewer assessment $1,000 per lot <br /> <br />9. Schedule: Estimated start of construction: May 17, 2004 <br />Estimated completion of work: September 24,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.