Laserfiche WebLink
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br />43 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT. <br /> STORM SEWER LF 300 5.00 $0.00 <br />44 COMMDN EXCAVATION (EV) CY 5000 700 1485 1485 $10,395.00 <br />45 COMMON EXCAVATION (EV). STORM SEWER <br /> CROSSINGS CY 4500 0.01 $0.00 <br />46 SUBGRADE EXCAVATION (EV) CY 2000 700 $0.00 <br />47 TOLERANCE CLASS 5 . TYPE IV IMPROVEMENTS ONLY LF 6500 2.50 $0.00 <br />48 SUBGRADE PREPARATION. STREET SY 10900 0.01 $000 <br />49 GEOTEXTllE FABRIC, TYPE V SY 10900 1.40 100 350 $49000 <br />50 SElECT GRANULAR BORROW (CV) CY 7000 12.00 200 200 $2,400.00 <br />51 AGGREGATE BASE, ClASS 5 TN 5150 8.00 400 400 $3,20000 <br />52 TYPE LV4 WEARING COURSE MIXTURE (B). <br /> DRIVEWAYS TN 225 77.00 $000 <br />53 TYPE LV 3 NON WEARING COURSE MIXTURE (B) TN 3975 47.50 $0.00 <br />54 TYPE LV 3 WEARING COURSE MIXTURE (8) - 2009 TN 2850 48.00 $000 <br />55 BITUMINOUS MATERiAl FOR TACK COAT. 2009 GAL 1850 US $0.00 <br />56 SAW AND SEAL TRANSVERSE JOINTS IN BITUMINOUS <br /> WEAR COURSE. 2009 LF 6700 1.70 $0.00 <br />57 CONCRETE CURB AND GUTTER LF 2250 14.00 $0.00 <br />58 CURB REINFORCEMENT BARS, NO.4 LF 1120 0.50 $000 <br />59 6" CONCRETE DRIVEWAY PAVEMENT SY 55 40.00 $000 <br />60 TOPSOIL BORROW (lV) CY 400 12.00 $000 <br />61 SODDING, LAWN TYPE SY 2300 4.00 $0.00 <br />62 TURF REINFORCEMENT MAT SY 50 12.50 $000 <br />63 TRANSPLANT TREE. PINE EA 7 150.00 $0.00 <br />64 TRANSPLANT TREE. DECIDUOUS EA 1 150.00 $0.00 <br />65 SEGMENTAL RETAINING WAll SF 1750 17.00 $0.00 <br />66 CONSTRUCT RAIN GARDEN SF 8500 375 $000 <br />67 SEEDING, INCl. MNDOT SEED MIX 270 AND EROSION <br /> CONTROl BLANKET, CATERGORY 3, BIDDEGRADABlE <br /> NETTING 5Y 950 1.90 $0.00 <br />68 DITCH EXCAVATION. 73RD STREET, NORTH OF <br /> EXISTING flARED END SECTION lF 50 3300 $0.00 <br />69 CATCH BASIN PROTECTION EA 18 50.00 8 $400.00 <br />70 STREET SWEEPER (PICKUP BROOM W/OPERA TOR) HR 35 80.00 $0.00 <br /> TOTAL PART 2 - TYPE III & IV IMPROVEMENTS: $97,946.00 <br /> PART 3 . TYPE V IMPROVEMENTS. CLEAR RIDGE, GRANGE VIEW, BRIAN WAY, BRIAN DRIVE, AND FOX RUN AREAS: <br />71 REMOVE BITUMINOUS PAVEMENT SY 1975 3.00 300 300 $900.00 <br />72 REMOVE CONCRETE CURB AND GUTTER lF 750 4.00 $000 <br />73 REMOVE BITUMINOUS DRIVEWAY SY 150 4.00 $0.00 <br />74 REMOVE BITUMINOUS PATH 5Y 20 4.00 $0.00 <br />75 REMOVE STORM SEWER PIPE LF 80 8.00 $0.00 <br />76 SALVAGE AND REINSTAll IRRIGATION LINES IF 100 3DO $0.00 <br />77 SALVAGE AND REINSTAll IRRIGATION HEADS EA 5 80.DO $0.00 <br />78 BOLT REPLACEMENT - HYDRANT AND GATE VALVE EA 9 1100.00 8 8 $8,80000 <br />79 BOLT REPLACEMENT - GATE VALVE EA 9 500.00 9 9 $4,50000 <br />80 SALVAGE AND REINSTALL MAilBOX EA 5 100.00 $0.00 <br />81 ADJUST EXISTING VALVE BOX EA 9 400.00 $0.00 <br />82 ADJUST EXISTING SANITARY SEWER MANHOLE <br /> FRAME AND RING CASTING EA 13 500.00 $0.00 <br />83 ADJUST EXISTING STORM SEWER CATCHBASIN <br /> FRAME AND RING CASTING EA 3 300.00 $000 <br />84 ADJUST EXISTING STORM SEWER CATCHBASIN <br /> MANHOlE FRAME AND RING CASTING EA 6 600.00 $000 <br />85 GROUT EXISTING STRUCTURE, INCl DOGHOUSES, <br /> INVERTS, BENCHES EA 5 300.00 $0.00 <br />86 SAWING BITUMINOUS PAVEMENT LF 1500 100 $000 <br />87 MILL BITUMINOUS CONSTRUCTION JOINT LF 185 300 $0.00 <br />81809170REQ2.x1s <br /> 20 <br />