Laserfiche WebLink
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 4. OFF PROJECT. DIRECTIONAL DRILL WATER SERVICES: <br />142 CONNECT WATER SERVICE TO EXISTING PLUMBING INSIDE <br /> HOME EA 31 400.00 $000 <br />143 1" WATER SERVICE DIRECTIONAL DRILLED - CURB STOP TO <br /> HOME Lf 1550 21.00 $0.00 <br />144 TOPSOIL BORROW (LV) CY 150 10.00 $000 <br />145 SODDING, LAWN TYPE SY 1000 2.65 $0.00 <br /> TOTAL PART 4 - Off PROJECT - DIRECTIONAL DRILL WATER SERVICES: $0.00 <br /> CHANGE ORDER NO.1 <br /> fUNDING AGENCY CONTRACTING REQUIREMENTS LS 8000.00 0.5 0.5 $4,00000 <br /> TOTAL CHANGE ORDER NO.1 $4,000.00 <br /> CHANGE ORDER NO.2 <br />1 REMOVE BITUMINOUS PAVEMENT SY 60 3.00 $0.00 <br />2 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 30 4.00 $0.00 <br />3 ADJUST EXISTING VALVE BOX EA 1 600.00 $000 <br />4 SAWING BITUMINOUS PAVEMENT Lf 100 4.00 $0.00 <br />5 SAWING CONCRETE PAVEMENT Lf 10 4.00 $0.00 <br />6 CONNECT TO EXISTING B" WATER MAIN EA 2 800.00 $0.00 <br />7 8" PVC C900 WATER MAIN, DR 18 Lf 530 52.00 $0.00 <br />8 6" PVC C900 WATER MAIN, DR 18 Lf 18 25.00 $0.00 <br />9 8" GATE VALVE AND BOX EA 2 1500.00 $0.00 <br />10 DUCTIlE IRON fITTINGS LB 240 lOO $0.00 <br />11 1" CORPORATION STOP WITH 8" SADDLE EA 8 300.00 $0.00 <br />12 1" CURB STOP AND BOX EA 8 300.00 $0.00 <br />13 1" WATER SERVICE - MAIN TO CURB STOP Lf 40 14.00 $0.00 <br />14 1" WATER SERVICE DIRECTIONAL DRILLED - MAIN TO CURB <br /> STOP Lf 270 noo $0.00 <br />lS IMPROVED PIPE fOUNDATION, PER 6" INCREMENT. WATER <br /> MAIN Lf 250 5.00 $0.00 <br />16 SElECT GRANULAR BORROW (CV) CY 40 14.00 $0.00 <br />17 AGGREGATE BASE, ClASS S TN 35 12.00 $0.00 <br />18 TYPE LV4 WEARING COURSE MIXTURE (B) - DRIVEWAYS TN 4.85 110.00 $0.00 <br />19 TYPE LV 3 NON-WEARING COURSE MIXTURE (B) TN 10 76.00 $0.00 <br />20 TYPE LV 3 WEARING COURSE MIXTURE (B) - 2010 TN 10 noo $0.00 <br />21 BITUMINOUS MATERIAL fOR TACK COAT. 2010 GAL 5 6.40 $0.00 <br />22 6" CONCRETE DRIVEWAY PAVEMENT SY 30 44.00 $0.00 <br />23 TOPSOIL BORROW (LV) CY 25 4.00 $0.00 <br />24 SODDING, LAWN TYPE SY 225 2.65 $0.00 <br />25 1" CORPORATION STOP WITH 8" SADDLE EA 12 300.00 $0.00 <br />26 1" CURB STOP AND BOX EA 12 300.00 $000 <br />27 1" WATER SERVICE - MAIN TO CURB STOP Lf 100 14.00 $0.00 <br />28 1" WATER SERVICE DIRECTIONAL DRILLED - MAIN TO CURB <br /> STOP Lf 282 22.00 $0.00 <br />29 TOPSOIL BORROW (LV) CY 25 10.00 $0.00 <br />30 SODDING, LAWN TYPE SY 200 2.65 $0.00 <br /> TOTAL CHANGE ORDER NO.2 $0.00 <br /> CHANGE ORDER NO, 3 <br />1 MUCK EXCAVATION (EV) CY 3100 15.20 2500 2500 $38,00000 <br />2 LIGHTWEIGHT BACKfiLL (WOOD CHIPS) (LV) CY 3750 2600 2600 2600 $72,BOO.OO <br />3 SELECT GRANULAR BORROW (LV) I1-WAY HAUL) CY 1500 16.60 1200 1200 $19,92000 <br />4 COMMON EXCAVATION (EV) CY 650 .600 $0.00 <br />5 SElECT GRANULAR BORROW (CV) CY 1150 -14.00 $000 <br />6 4" PERfORATED POlYETHYlENE DRAINTILE PIPE WITH SCOK <br /> WRAP Lf 1000 -2.00 $000 <br />7 CREW HOURS HR 17 755.00 17 17 $12,63500 <br />616091B9REQ2.x1s <br /> 28 <br />