My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-01-29 - 2004 Residential Street Improvement Project Input Meeting
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2004
>
2004-01-29 - 2004 Residential Street Improvement Project Input Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2009 7:38:38 AM
Creation date
6/22/2009 7:38:29 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Centerville <br />2004 Residential Street Improvements <br />Public Information Meeting <br />Thursday, January 29, 2004 6:30 P.M. <br /> <br />Streets Affected and ProDosed ImDrovements: <br /> <br />1. Lamotte Drive from Heritage Street to Lamotte Park. <br />Water main, storm sewer, new street with concrete curbs <br /> <br />2. Heritage Street from Lamotte Drive to Centerville Road <br />Water main, storm sewer, new street with concrete curbs <br /> <br />3. Center Street from Centerville Road to Dupre Road <br />Water main, storm sewer, new street with concrete curbs <br /> <br />4. Tourville Circle, Pheasant Lane and Oak Circle <br />Water main, storm sewer, new street with concrete curbs <br /> <br />5. Dupre Road from Eagle Pass to south end. <br />Water main, storm sewer, patch existing street, sidewalk <br /> <br />6. Brian Drive from Main Street to south of creek. <br />New street with concrete curbs <br /> <br />7. Shad Avenue from Main Street to Fox Run. <br />Water main, storm sewer, new street with concrete curbs <br /> <br />8. Peterson Trail from Fox Run to 73rd Street. <br />Mill pavement and overlay. <br /> <br />9. 73rd Street from Brian Drive to 20tn Avenue. <br />Mill pavement and overlay <br /> <br />Estimated Project Cost: $2.5 million <br />Proposed Assessments: $1.0 million <br />Schedule: Construction from May - September 2004 <br />City Engineer: Tom Peterson (651-604-4868) <br /> <br />Main reasons for project: City goal to provide city water to all residents. Street <br />pavements in poor condition, drainage problems in many areas, low interest rate for <br />borrowing money. <br />
The URL can be used to link to this page
Your browser does not support the video tag.