My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-01-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2004
>
2004-01-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2009 8:01:37 AM
Creation date
6/22/2009 7:59:21 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~'.n " ,"e. ""P' <br /> <br /> <br />.. <br /> <br />BONESTRoa ROSENE ANDERLIK <br /> <br />6516361311 <br /> <br />p.l <br /> <br />- <br /> <br />Fax Transmission <br /> <br />'/1' !onesl"'" <br />GlloooIne <br />"" AnderRk& <br />'IJ' Associate< <br />tnG-.....'C,Mf1H.,. <br /> <br />Date: 1/22(2004 <br /> <br />From: Tom Peterson <br /> <br />To: Karl Hammers <br /> <br />Our File No: 616-00-115 <br />P/iiges to Follow: .. 0 <br />OrigInal Will Follow In Mall: Yes 0 No IZ1 <br /> <br />OrganIzation: Rice Creek Watershed <br /> <br />Fax Numb~: 763-398-3088 <br />Subject: Centervllle- Hardwood Estates Pond <br /> <br />HI Karl, <br /> <br />I received this fax today from paul Palzer. Public Works Director In Centerville. He fO\Jnd some old maps In <br />hIs archives, from 1971. 1984, and 1988. They show the ou1llne of ponds and wetlan(:ls along Brtan Drive, <br />prior to any streets or houses. I superimpOSed these on a current base map of the City in this ares. You <br />can see the edge of wetland In the Hardwood Estates pond runs diagonally through the current pond <br />footprint. <br /> <br />Based on thIs Information, I would say we could remove sediment from the southwestpart of the pond. <br />(within the old wetland delineation) end deposIt It In the northeast area (outside the watland). ThIs is vary <br />close to what I show on the c%rad map I sent you on JanuB/}' 13, 2004, Wa could note on that plan that <br />only sediment from the road be excavated. . ThIs could be monitored In the field during construction. I <br />estImate there is 1 to:2 feet of sediment on top of the original ground line. <br /> <br />. . <br />I plan to send the map out to several local contractors early next week to provide e cost quote for this work, <br />which needs to be done In wlnter conditions. We could do some hand borings prior to construction to <br />confirm sediment depths.. <br /> <br />Call me at 651-604-4868 with questions and comments. <br /> <br />. ". <br /> <br />CC: Paul Pelzer <br /> <br />Bonostroo.. Roa&ne, Andtltl/k and ~soc:'e.t&a www.bonllstroo.com <br />2335 West Highway 38 + St. Paul, MN 55113 + Phone: 651-636-4600 + Fax: 651-636-1311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.