Laserfiche WebLink
<br />aty of Centetville <br />PW Area Street & utility Imp. <br /> <br />Page 2 <br />5127109 <br /> <br />SubDart 3 - Underaround Debris Removal and DlsDOsal <br />While excavating for the installation of the water main in the area mentioned above, an <br />underground bridge structure was encountered. The structure was in the way of the proposed <br />water main and needed to be partially demolished. The contractor has provided a letter showing <br />two options for disposal of the material and has also shown costs for the initial removal of the <br />material from the trench. The time for this work has been verified with our inspector's diaries. <br />We are recommending utilizing the second option of drying, separating and recycling the material <br />which is about half the cost of landfilling the material as-is. <br /> <br />If the council finds the information provided to be satisfactory and wishes to move forward with <br />the work, it would be appropriate to have them approve Change Order #3 as presented. <br /> <br />Sincerely, <br /> <br />BONESTROO <br /> <br />~.,;4 .._A~l <br /> <br />Mark Statz, PE <br />City Engineer <br />651-604-4709 <br /> <br />Attachments: Change Order #3 Costs <br />Letters and Documentation from the Contractor <br />Letter from American Engineering Testing <br />S'l4!Tl'H'! S oF' CUlS' SlA-n6NS' ~F ""..A.t\ <br /> <br />cc: Paul Palzer - Public Works Director <br />RJG, CWL - Bonestroo <br />