Laserfiche WebLink
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> PART 1 - PROJECT MANAGEMENT: <br />1 MOBILIZATION LS nooo.oo 0.3 $6,60000 <br />Z TRAFFIC CONTROL LS . 400000 0.3 $l,ZOOOO <br /> TOTAL PART 1 - PROJECT MANAGEMENT: $7,800.00 <br /> PART 2 - TYPE III & IV IMPROVEMENTS: <br />3 TEMPORARY ROCK CONSTRUCTION ENTRANCE TN 50 1500 $0.00 <br />4 SILT FENCE, MACHINE SLICED LF 1700 040 $0.00 <br />5 REMOVE BITUMINOUS PAVEMENT SY 29300 2.00 20855 $41)1000 <br />6 REMOVE CONCRETE CURB AND GUTTER LF 2250 4.00 1806 2106 $8,42400 <br />7 REMOVE BITUMINOUS DRIVEWAY SY 375 4.00 $0.00 <br />8 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 50 5.00 25 25 $12500 <br />9 REMOVE STORM SEWER PIPE LF 100 800 $0.00 <br />10 REMOVE TREE EA 10 95.00 $000 <br />11 REMOVE STORM SEWER CATCH BASIN MANHOlE EA 4 300.00 2 $600.00 <br />12 BOLT REPLACEMENT - HYDRANT AND GATE VALVE EA 15 1100.00 15 $16,50000 <br />13 BOLT REPLACEMENT - GATE VALVE EA 24 400.00 18 $7,200.00 <br />14 SALVAGE AND REINSTALL IRRIGATION LINES LF 250 3.00 $0.00 <br />15 SALVAGE AND REINSTALL IRRIGATION HEADS EA 10 80.00 $0.00 <br />16 ADJUST EXISTING CURB BOX EA 10 11000 $0.00 <br />17 ADJUST EXISTING VALVE BOX EA 23 300.00 $0.00 <br />18' ADJUST EXISTING SANITARY SEWER MANHOlE FRAME AND <br /> RING CASTING EA 39 50000 $0.00 <br />19 ADJUST EXISTING STORM SEWER CATCHBASIN FRAME AND <br /> RING CASTING EA 7 300.00 2 2 $60000 <br />20 ADJUST EXISTING STORM SEWER CATCHBASIN MANHOLE <br /> FRAME AND RING CASTING EA 16 600.00 5 5 $3,00000 <br />21 RECONSTRUCT SANITARY MANHOLE LF 11 300.00 4 $1,20000 <br />22 RECONSTRUCT EXISTING VALVE BOX EA 7 300.00 $0.00 <br />23 GROUTEXISTlNG STRUCTURE, INCl. DOGHOUSES, INVERTS, <br /> BENCHES EA 25 250.00 $0.00 <br />24 SAWING BITUMINOUS PAVEMENT LF 775 3.00 $0.00 <br />25 SAWING CONCRETE PAVEMENT LF 50 4.00 20 20 $8000 <br />26 MILL BITUMINOUS CONSTRUCTION JOINT LF 300 300 $0.00 <br />27 REMOVE EXISTING 18" TRASH GUARD EA 1 60.00 $0.00 <br />28 ClEAN EXISTING STORM PIPE LF 300 5.00 $0.00 <br />29 CONNECT TO EXISTING STORM SEWER STRUCTURE EA 1 600.00 $0.00 <br />30 CONNECT TO EXISTING RCP STORM SEWER EA 5 600.00 $600.00 <br />31 INSTALL 18" TRASH GUARD ON EXISTING FLARED END SECTION EA 1 350.00 $0.00 <br />32 15" RCP FLARED END SECTION, INCl. TRASH GUARD EA 2 800.00 $0.00 <br />33 12" RCP STORM SEWER, CLASS 5 LF 135 30.00 128 128 $3,84000 <br />34 15" RCP STORM SEWER, ClASS 5 LF 365 3300 47 $1,551.00 <br />35 18" RCP STORM SEWER, CLASS 5 LF 48 36.00 $0.00 <br />36 CLASS III RANDOM RIPRAP CY 70 70.00 $0.00 <br />37 2' X 3' CB, INCl R-3067-V CSTG AND CONC ADJ RINGS EA 3 1600.00 2 $3,200.00 <br />38 4' DIA STORM SEWER CBMH, INCl. R-3067.V CSTG AND CONC <br /> ADJ RINGS EA 7 1800.00 4 $7,200.00 <br />39 CONSTRUCT 4' DIA CBMH OVER EXISTING STORM SEWER PIPE, <br /> INCl. R-3067-V CSTG AND CONC ADJ RINGS EA 1 2500.00 1 $2,500.00 <br />40 CONNECT DRAINTILE TO EXISTING STORM STRUCTURE EA 42 180.00 14 14 $2,52000 <br />41 4" PERFORATED POLYETHYLENE DRAINTIlE PIPE WITH SOCK <br /> WRAP LF 3500 3.00 3098 3098 $9,29400 <br />42 4" PERFORATED POLYETHYLENE DRAINTILE PIPE WITH COARSE <br /> FIlTER AGGREGATE, GEOTEXTILE WRAP, AND SOCK WRAP LF 12400 800 5199 5199 $41,592.00 <br />43 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT - STORM <br /> SEWER LF 300 5.00 $0.00 <br />44 COMMON EXCAVATION (EV) CY 5000 700 2401 3886 $27,202.00 <br />45 COMMON EXCAVATION lEV). STORM SEWER CROSSINGS CY 4500 0.01 1401 1401 $14.01 <br />46 SUBGRADE EXCAVATION (EV) CY 2000 700 $000 <br />61609170REQ3.xIs <br />