Laserfiche WebLink
<br />Page 1 of2 <br /> <br />, <br /> <br />~ <br /> <br />Jim March <br /> <br />To: Wayne LeBlanc; Tom Wilharber; Tom Peterson; Tim Swedberg; Theresa Brenner; Teny Sweeney; <br />Rob Sheppard; Ray Devine; Patricia Scott; Michelle Moser; Mary Capra; Mari Nelson; Lori Dam; <br />Unda Broussard Vickers; John Mclean; Jim Hoeft; Elizabeth Scheller; Doug Porter; Dick Travis; <br />Dave Kilian; Brian Hanson; BiIIlngison; Bany Brainard; Aimee Fairbrother; Hannah Tilsen <br /> <br />Subject: Week in Review <br /> <br />Week in Review <br /> <br />March 2, 2001 <br /> <br />Building Permits this Period = 1 <br />Building Permits YTD = 14 <br />New Homes Year to Date = 6 <br /> <br />A~AA~~AAAA~AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA..AAAAA~AAAAAAAAAAAAAAAAA4AA4AAAAAAAAAAAAAA~AAAAAAAAAAAAAA4AALA <br /> <br />* I have been informed by Public Works that the skating rinks are still open, but possibly <br />not for long. This may be the last weekend if you want to get out and skate. <br /> <br />* A meeting was held with Paul McDowell of Northern Forest Products. Paul Palzer and <br />Milo Bennett met with Mr. McDowell to finalize the requirements for the building permit for <br />the Northern Forest Products expansion. Construction should begin in approximately sixty <br />days. The building expansion will be approximately 25,000 square feet. It's great to see <br />the local businesses expanding. <br /> <br />* I met with Mike Kraft from Shea Architects yesterday. Shea Architects designed the <br />County Bank in Centerville. Mr. Kraft submitted a proposal for design services for the <br />proposed new monument entrance sign. The scope of services would include meeting with <br />interested City representatives to discuss design objectives and conceptual review of other <br />signs. They would develop and present up to three options for sign design, including <br />colors and methods of lighting. They would develop a preferred design option to include a <br />pricing document for bidding to sign manufacturer(s). Also included is their review of shop <br />drawings from selected sign manufacturer and review of construction of sign during <br />fabrication and at completion of installation. They would bill on an hourly basis with a cost <br />estimate of $1600 plus reimbursable expenses of approximately $200. I was told that this <br />is a low cost project for them, but they are highly interested in working in Centerville. Mr. <br />Kraft indicated that they would be extremely interested in designing a sign that would be <br />complimentary to the County Bank. Furthermore, Mr. Kraft submitted a proposal for design <br />concept services for the downtown area and the undeveloped commercial area near the <br />interchange. I also have a design proposal for the monument entrance sign coming from <br />ColorSigns. <br /> <br />* Lloyd Drilling received approval of his developer's agreement for his proposed <br />commercial center. He would like to pick up the building permit within the near future. <br /> <br />3/2/01 <br />