Laserfiche WebLink
<br />r--- --- <br /> <br />Jul. 3. 2001 11 :58AM <br /> <br />.1 <br /> <br />.~ <br /> <br />;; ';;;;;;;;;;;;;;::A <br />: ~ ~ <br /> <br />CITY BLAINE CaMY DEY <br /> <br />No.1355 p, 2/9 <br /> <br />~~ <br /> <br />ACCESSORY 'BUILDINGS (SHEDS <br /> <br />Zoning Ol:dinance allows only one yard shed in the Residential Zoning Districts. Homeowners are <br />responsible for locating and exposing their property line corner stakes, to verify correct <br />building setbacks. Property line llIld easement information can be found on a Certificate of <br />Survey, Abstract or Deed. <br /> <br />LOCATION: <br /> <br />SETBACKS: <br /> <br />SIZE: <br /> <br />HEIGHT: . <br /> <br />EXTERIOR: <br /> <br />FLOOR: <br /> <br />PERMITS: <br /> <br />NOTE: <br /> <br />The shed must be loca.ted in the rear yard or sideyard if the shed can be <br />accessed ftom the residence living space by door (see diagram). <br /> <br />R-I, R-IM, R.IA and RF zoning districts require a minimum of five (5) <br />foot side yard llIld five (5) foot rClll: yard setback (refer to development <br />contract). Sheds cannot be placed in any drainage or utility ClISctllent and <br />must be at least 6 feet from the house or garage. <br /> <br />Maximum floor area of 200 square feet. <br /> <br />Fifteen (15) foot lI1llXimlDll at highest point. <br /> <br />The architectural style, color and caofrng shall be compatible with the <br />principal building. Roofs shall be designed to carry II 30-pound snow load. <br /> <br />Treated wood or four (4) inch concrete slab. AU sheds must be anchored to <br />concrete slab or stmpped to concrote slab or strapped to "corkscrew" type soil <br />IIllChors. <br /> <br />If the floor area of the shed exceeds 100 square feet, a building permit is <br />required. Permit fee is $25.50. <br /> <br />In mobile home parks, sheds are allowed by permit only with written <br />approval from the plll'k management approving the location, size, style, <br />lIllChorini and type of floor. <br /> <br />NOTICE: IT WJLL TAKE APPROXIMATELY 7 TO 10 DAYS TO GE:T A. PERMIT ONCE nu: <br />PLANS AM) APPUCATION HA. VE BEEN SUBMITTED. <br /> <br />ihedo.ho <br />113/00 <br />