Laserfiche WebLink
<br />~ U.5"'''''' "'.I." <br /> <br />Centerville staff are going to meet with the interconnect installer next week. <br /> <br />* There is a meeting at 2:00 next week Monday at the RCWD offices in Arden Hills. The <br />meeting is to discuss the proposed addition of a low flow culvert under 1-35E that would <br />discharge into Clearwater Creek. This project is to assist upstream property owners in their <br />future development efforts. The supporting study that was sent to the City in regards to this <br />project is a compilation of highly technical data and jargon produced from a hydraulic <br />modeling study by the RCWD district engineers. I expressed concern about this report to <br />our engineering firm and the proposed downstream impact to Centerville. I am very <br />impressed by the written response forwarded to the RCWD from the water resource <br />specialist Dan Edgerton from our engineering firm. Mr. Edgerton created two pages of <br />specific questions that he wants answered by the RCWD engineers. I was told by Kate <br />Drewry (RCWD Administrator) that the impact to Centerville would only occur in low flow <br />scenarios. I will attend this meeting along with Paul Palzer. We will report back our <br />findings. This meeting is being held prior to formal pUblic hearings on the proposed <br />project. <br /> <br />* Enjoy your weekend! <br /> <br />5/19/00 <br />