My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-10-01 P & Z Agenda
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2002
>
2002-10-01 P & Z Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2009 8:30:35 AM
Creation date
7/20/2009 8:29:51 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />Permit Application No. 02-104 <br /> <br />Pete Rosenthal <br /> <br />Exhibits: <br /> <br />Findings: <br /> <br />7. Copy of receipt from County Recorder and signed/notarized <br />legal document(s). Note that legal document(s) are to be <br />submitted by Applicant to County for recording only after <br />approval by District. <br /> <br />8. Cash surety in the amount of $2,500. <br /> <br />1. Permit Application dated September 5, 2002, received September 5, <br />2002. <br /> <br />2. <br /> <br />Grading, Drainage, and Erosion Control Plan prepared by E.G. Rud <br />and Sons, Inc., dated September 5, 2002, received September 5, <br />2002. <br /> <br />3. <br /> <br />Infiltration checklist and worksheet prepared by Plowe Engineering, <br />Inc., undated, received September 5, 2002. <br /> <br />4. <br /> <br />Hydrologic calculations prepared by Plowe Engineering Inc., dated <br />September 4, 2002, received September 5, 2002. <br /> <br />" <br /> <br />5. <br /> <br />Wetland Delineation Report prepared by Peterson Environmental <br />Consulting, Inc., dated July 31, 2002, received September 5, 2002. <br /> <br />1. <br /> <br />Proposed project entails construction of a 9,4500t SF building and <br />parking lot revisions resulting in a net increase of 0.5", acres of <br />impervious surface and total impervious for the site of I.2H acres. <br /> <br />2. Proposed Stormwater Management Plan includes one on-site NURP <br />Pond. Post Development runoff for the entire site is higher then <br />existing conditions for the 2-year event. A revised plan complying <br />with District rate control requirements is required. The proposed <br />pond meets District water quality treatment requirements. <br /> <br />The proposed infiltration cell meets the District's infiltration sizing <br />standard. However, there is no pretreatment of stormwater flowing <br />from the parking lot into the infiltration cell. Pretreatment of <br />stormwater prior to the infiltration area is required. A copy of soil <br />borings is required to verify depth to water table and that substrate <br />materials are suitable for infiltration practices. <br /> <br />3. The wetland delineation report identifies 0.1 acres of Type 3 wetland <br />along the northern boundary of the site. There is no proposed <br />wetland fill. Field verification by District Staff of wetland <br />boundaries is required. <br /> <br />Emmons & Olivier Resources, Inc. <br /> <br />9/13/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.