Laserfiche WebLink
<br />Effective 9/5/00 <br />City of Centerville Ord. #4 <br /> <br />2. The applicant may re-file his plan so that it does substantially <br />comply with the outline development plan;'or <br /> <br />3. The applicant may file a written request with the Planning and <br />Zoning Commission that it hold a public hearing on his request <br />for final approval. Any such hearing shall be held within thirty <br />(30) days after the request for such hearing. Within forty-five <br />(45) days of. such hearing the Planning and Zoning <br />Commission shall either grant or deny preliminary approval to <br />the plan. <br /> <br />C. Final Approval. The City Council shall review and approve the Final Development <br />Plan if it is in substantial compliance with Preliminary Development Plan. Following <br />this, the applicant shall record the Final Development Plan in the manner provided <br />for recording subdivision plats. If the Final Development Plan is not in substantial <br />compliance, the applicant shall be requested to repeat the procedures outlined for <br />the Preliminary Development Plan. <br /> <br />Section 175-210: Time Limit. If work on the PUD is not started within three months of the proposed <br />schedule date after final approval has been granted, approval shall terminate unless an extension period <br />is requested or granted by the City Council. <br /> <br />Section 175.220: Amendments. Amendments may be made in the approved final plan when they are <br />shown to be required by changes in conditions that have occurred since the final plan was approved or <br />by changes in the Development Policy of the City. <br /> <br />A. Minor changes in the location, sitting, and height of buildings and structures may be <br />authorized by the City Engineer if requested by engineering or other unforeseen <br />circumstances. <br /> <br />B. All other changes in use, rearrangement of lots, blocks, and open space, must be <br />authorized by the City Council under procedures outlined for amendment of the <br />Zoning Ordinance. <br /> <br />Section 175.230: Completion. Completion of the PUD shall be certified by the Planning and Zoning <br />Commission on the Final Development Plan. Thereafter, the use of land and the construction, <br />modification, or alteration of any buildings shall be governed by the approved Final Development Plan. <br />Changes may be authorized only under the procedures provided below: <br /> <br />A. Minor extension, alterations or modifications of existing structures may be <br />authorized by the Planning and Zoning Commission if they are consistent with the <br />intent and purpose of the final plan and do not increase the cube of any building or <br />structure by more than ten (10) percent; and <br /> <br />B. Changes in the use of common open space or the replacement of any building <br />substantially destroyed which exceeds the intent and purposes of the Final <br />Development Plan may be authorized only by amendment to the final development. <br />Page 52 of 59 <br />