Laserfiche WebLink
<br />closer than four (4) feet to the side property line; and <br /> <br />5 Amended: <br />4 Amended: 2/19/02 <br />3 Amended: 91410 1 <br />2 Amended: smo 1 <br />1 Amended: 1130101 <br />E_.9/5100 <br />City of Centerville Om. #4 <br /> <br />D. On a corner lot in any Residential District, nothing shall be erected, placed, planted, <br />or allowed to grow in such a manner as materially to impede vision between a <br />height of two and one-half (2 1/2) and ten (10) feet above the centerline grades of <br />the intersecting streets in U1B ar:ea trianale5 bounded by the street of the lot and a <br />line joining points along the street lines fifty (50) feet from the point of the <br />intersection. <br /> <br />Section 120..030: Erection of More than One Principal Structure on Lot. In any district, more than <br />one structure housing a conforming principal use may be erected on a single lot if yard and other <br />requirements of this ordinance are met for each structure as though it were on an individual lot <br />Required on-site parking space shall be provided on the same lot as theprincipal building or use, except <br />that combined or joint parking facilities may be provided for two (2) or more buildings or uses in <br />commercial districts and in industrial districts, provided that the total number of spaces is not less than <br />the sum of the requirements for each building or use. The proposed joint parking space shall be within <br />four hundred (400) feet of the entrance of the use it will serve. A properly drawn legal instrument, <br />approved by the City, executed by the parties concerned, for joint use of the off-street parking facilities <br />shall be filed with the County Recorder's office. <br /> <br />Division 125: Performance Standards <br /> <br />Every use permitted by this ordinance shall be so established and maintained as to comply with the <br />provisions of this section. The Council may require the owner or operator of a use permitted by this <br />ordinance to provide such tests or investigations by an independent testing organization satisfactory to <br />the Council as are necessary to show compliance with these standards. The cost of such investigation <br />and tests shall be shared equally by the owner or operator and the City unless the results disclose non- <br />compliance with these standards; in that event, the entire cost shall be borne by the owner or operator. <br />This provision does not preclude the City from making any investigations and tests it finds appropriate to <br />determine compliance with these standards. <br /> <br />Division 130: On-Site SewaQe Treatment Standards <br /> <br />The installation and repair of individual on-site sewer systems shall be in compliance with Minnesota <br />Pollution ControlAgency Rules, Chapter 7080. <br /> <br />A. Permit Required: No person shall install, repair, alter or pump an on-site sewer <br />system without first obtaining a permit <br /> <br />B. License Required: Installation, repair, pumping and hauling of private on-site sewer <br />systems requires licensing per MPCA Rules, Chapter 7080 as administered by the <br />County. <br /> <br />p""" 41'> of7, <br />