Laserfiche WebLink
<br />38.01. DEVELOPMENT IMPROVEMENTS] <br /> <br />38.01-01 SITE GRADING. 3 <br /> <br />1. The Developer shall do all site grading including the front 100 feet <br />of the lots, common green way and open spaces, storm water storage <br />ponds and surface drainage ways including sodding of boulevards all <br />in accordance with the approved grading, drainage and site plan. A <br />grading plan with maximum two foot contours and cross sections as <br />necessary shall be submitted and approved by the City prior to <br />commencement of any site grading. ] <br /> <br />2. Boulevards shall be graded at an incline of two percent (2%) behind <br />the curb. The sidewalk construction shall be in accordance with the <br />City approved Street Scape and shall reflect a consistent grade that <br />follows the back of the curb. ] <br /> <br />3. <br /> <br />A. <br /> <br />After substantial building completion and prior to the <br />issuance of an occupancy permit, a Certificate of Survey <br />shall be provided to the City verifying that the lot grading has <br />been accomplished to the approved standards. ] <br /> <br />B. The Certificate of Survey will locate the following: ] <br />1. Property irons. ] <br />2. Buildings. ] <br />3. Driveways.] <br />4. Drainage easements. 3 <br />5. Utility easements. ] <br />6. Sewer service at the property line. ] <br />7. Water service and shut off at the property <br />line.] <br /> <br />C. The Certificate will also provide the followiny elevations: 3 <br />1. Grading at the front lot line. <br />2. Grading at property comers. 3 <br />3. Lowest floor elevation and structure type. ] <br />4. 100 year flood elevation and 100 year flood <br />] <br />contour property. <br /> <br />38.01-2 SOIL EROSION. The Developer shall control soil erosion insuring: 3 <br />1. All development shall conform to the natural limitations presented <br />by the Topography and soil of the subdivision in order to created the <br />best of potential for preventing soil erosion. The Developer shall <br />submit an erosion control plan, detailing all erosion control measures <br />to be implemented during construction, said plan shall be approved <br /> <br />Page 14 of34 <br />