My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-06 P & Z Agenda
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2003
>
2003-05-06 P & Z Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2009 1:14:39 PM
Creation date
7/20/2009 1:13:30 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />RESOURCE <br />STRATEGIES <br />CORPORATIO <br />N <br /> <br />14001 RIDGEDALE DRIVE <br />SUITE 300 <br />MINNETONKA, MN <br />55305 <br />952/513-9548 <br />~/J.yat;?1r:;,1':l:_aJ:;Aa <br /> <br />April 17, 2003 <br /> <br />Ms. Cheryl Olsen <br />Metropolitan Council <br />230 East Fifth Street <br />St. Paul, MN 55101 <br /> <br />RE: City of Centerville Comprehensive Plan Amendment 2003-1 <br /> <br />Dear Ms. Olsen: <br /> <br />This letter summarizes issues I have discussed with Tori Dupre regarding a sewer <br />staging amendment in the City of Centerville. Also attached are copies of the <br />Plan Amendment Information Summary, and Centerville "Growth Management <br />Plan" and "Utility StaginglMUSA Additions" graphics illustrating the proposed <br />amendment. I also spoke with Don Bluhm, MCES, and he informed me that <br />downstream capacity in the metro system will currently accommodate sewer <br />flows planned for 2020. <br /> <br />The City has received a 43-acre single family residential development proposal <br />which includes 77 single family lots. Approximately 18 acres of the site is <br />located within the 2006-2010 sewer staging area and approximately 25 acres of <br />the site is located within the 2011-2020 sewer staging area. This development <br />will generate approximately 0.0208 mgd sewer flows. The City's approved sewer <br />staging plan includes the following projected wastewater flow data: <br /> <br />2000 0.299 mgd <br />2005 0.371 mgd <br />2010 0.436 mgd <br />2020 0.564 mgd <br /> <br />According to Don Bluhm, the 2002 wastewater flow data from Centerville was <br />approximately 0.273 mgd. Annual projected wastewater flows in the sewer <br />staging plan are anticipated to add approximately 0.014 mgd per year. This <br />estimate plus the proposed development would add a combined 0.0352 mgd to the <br />current cumulative flow of 0.273 mgd or an estimated 2003 total flow of 0.308 <br />mgd. As you can see from the table above, this anticipated flow is consistent with <br />2000 flow data and is well below 2005 and 2010 forecasts. <br /> <br />There is no land use change associated with the proposed development. The site <br />is currently guided Low/Medium Density Residential, which is consistent with the <br />proposed development. There are no regional park, transportation, or airport <br />issues associated with the proposed plan amendment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.