<br /> ----.~
<br />.'
<br /> Unit Quantity Quantity
<br /> No. Item Unit QUantity Price This Period To Date Amount
<br /> BASE BID B - PEDESTAL SPHEROID
<br />( CONSTRUCTION:
<br />6 600,000 GALLON STEEL FLUTED COLUMN
<br /> WATER TOWER- TOTAL BASE BID A LS $837,196.00
<br /> Breakdown of Base Bid B
<br /> 6a Design Drawings LS 1 $26,000 100.0% $26,000.00
<br /> 6b Founda:tion . LS 1 $210,000 100.0% $210,000.00
<br /> 6c Steel Fabricated to Site LS 1 $236,896 100.0% $236,896.00
<br /> 6d Reid Erection LS 1 $138,000 30.0% 80.0% $110,400.00
<br /> 6a Field Painting LS 1 $190,000 $0.00
<br /> 61 Field EleclrioaJ LS 1 $30,000 $0.00
<br /> 6g Cathodic Protection LS 1 $8,300 $0.00
<br /> T alai Breakdown $681,296.00
<br /> FOUNDATION PILING. BASE BID B - PEDESTAL
<br /> SPHEROID PILING:
<br /> 16 9-6/8' DIA. CAST-IN-PLACE CONCRETE TEST PILE EA 2 $1,600.00 2 $3,200.00
<br /> 17 9-6/8' DIA. CAST-IN-PLACE CONCRETE PILING,
<br /> DRIVEN LF 2080 $17.00 2061 $36,037.00
<br /> TOTAL FOUNDATION PILING $38,237.00
<br /> SITE WORK:
<br /> 20 SALVAGE AND REINSTALL CHAIN LINK FENCE LF 24 $29.16 24 $699.60
<br /> 21 SALVAGE, STOCKPILE, AND RESPREAD TOPSOIL LS 1 $100.00 1 $100.00
<br /> 22 REMOVE WATER MAIN LF 114 $10.00 114 $1,140.00
<br /> 23 REMOVE STREET SWEEPING MATERIAL CY 220 $6.00 $0.00
<br /> 24 SILT FENCE, REGULAR LF 600 $3.00 588 $1,764.00
<br /> 26 6' HIGH CHAIN LINK FENCE LF 136 $18.45 $0.00
<br />( 26 20' WIDE DOUBLE SWING GATE EA 1 $1,030.00 $0.00
<br />27 TYPE 41 BITUMINOUS FOR DRIVEWAYS TN 40 $40.00 $0.00
<br /> 26 TYPE 31 BITUMINOUS BASE COURSE TN 50 $40.00 $0.00
<br /> 29 AGGREGATE BASE, CLASS5,1000/0CRUSHED TN 700 $20.00 $0.00
<br /> 30 GEOTEXTILE FABRIC, TYPE V SY 360 $2.00 $0.00
<br /> 31 CONNECT TO EXISTING WATER MAIN EA 2 $600.00 2 $1,000.00
<br /> 32 16' PVC WATER MAIN LF 270 $45.00 286 $12,870.00
<br /> 33 16' DIP WA TERMAIN, CLASS 62,INCL POLY LF 115 $40.00 110 $4,400.00
<br /> 34 6' DIP WATER MAIN, CL 62,INCL POLY WRAP LF 10 $25.00 18.6 $462.60
<br /> 35 6'GATEVALVEANDBOX EA 1 $650.00 2 $1,300.00
<br /> 36 12'GATEVALVEANDBOX EA 1 $1,600.00 1 $1,500.00
<br /> 3716'ClATEVALVEANDBOX EA 1 $4,000.00 1 $4,000.00
<br /> 38 CAST IRON FITTINGS LB 2065 $2.00 3089 $6,178.00
<br /> 39 INSTALL HYDRANT EA 1 $1,800.00 1 $1,600.00
<br /> 40 OVERFLOW MANHOLE EA 1 $2,500.00 1 $2,500.00
<br /> 41 15' RCP STORM SEWER LF 120 $30.00 104 $3,120.00
<br /> 42 16' RCP FLARED END SECTION EA 1 $500.00 1 $600.00
<br /> 43 CLASS III RIPRAP, PLACED AT FLARED END
<br /> SECTION CY 5 $100.00 6 $600.00
<br /> 44 MNDOT SEED MIX 70A AC 0.2 $6,000.00 $0.00
<br /> 45 WOOD FIBER BLANKET SY 500 $6.00 $0.00
<br /> TOTAL SITE WORK $43,634.10
<br /> TOTAL BASE BID B $681,295.00
<br /> TOTAL FOUNDATION PILINGS $38,237.00
<br /> TOTAL SITE WORK $43,834.10
<br /> TOTAL WORK COMPLETED TO DATE $663,366.10
<br /> MATERIALS ON HAND:
<br />( None $0.00
<br /> TOTAL STORED MATERIAL6 $0.00
<br />
<br />$1603130 Req.4