Laserfiche WebLink
<br />1-35E Corridor AUAR <br /> <br />Issue: Regional Sanitary Sewer <br />Capacity <br /> <br />Existing Regional Sanitary Sewer Capacity is limited <br /> <br />MCES is updating comprehensive planning for the <br />'"Northeast Region" of the Twin Cities Metropolitan <br />Area <br /> <br />1-35E Corridor AUAR <br /> <br />Mitigation: Regional Sanitary Sewer <br />Capacity <br /> <br />Construct an additional imerceptor to sove the easterly portion of <br />Lino Lakes in 2006, ooich includes the AUAR area <br /> <br />The MCES interceptor currently being designed and scheduled for <br />construction in 2006 is bdow capacity for full build out ofScenarios <br />Two and Three <br /> <br />- Additional capacity is2.0mgd vvhereasfull build out of Scenario Two <br />requires an addilionaJ 2.6mgd <br /> <br />- The new MCES interceptor should provide adequate capacity through 2030 <br />according to the growth projections included in the AUAR (Table 7-4) <br /> <br />1.35E Corridor AUAR <br /> <br />Issue: Cultural Resources <br /> <br />Ten precontact archaeological sites have been <br />recorded in the AUAR area. most are located in <br />proximity to water <br /> <br />Approximately 50% of the AUAR area is considered <br />to have a high potential for archaeological sites <br /> <br />Development may cause intentional or unintentional <br />damage to, or destruction of. important archaeological <br />sites and historic properties <br /> <br />7 <br />